Inspections for the day of: Wednesday, June 17, 2009.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00164 INSP-Sprinkler Rough-in/Hydro6/17/20096/17/20096/18/2009 4:50:15 PMPPART
Basement area rough-in okayed per red-line annotations.
FIR09-00368 INSP-Sprinkler Rough-in6/16/20096/17/20096/18/2009 4:49:16 PMPPART
Overhead modifications at the tenant improvement area are okay for cover, one missing hanger installed while on site.
FIR07-00971 INSP-Final Inspection6/17/20096/17/20096/17/2009 3:00:04 PMPPART
Missing current set of approved plans on site for inspection as requested.
FIR09-00348 INSP-Sprinkler Rough-in/Hydro6/17/20096/17/20096/17/2009 1:20:11 PMPNR
Tom Phone #: ###-####
FIR09-00155 FIR-Aging Inspection6/17/20096/17/20096/17/2009 1:19:51 PM DONE
Pending site inspection request for work completed.
FIR08-00578 INSP-Sprinkler Rough-in/Hydro6/17/20096/17/20096/17/2009 1:18:42 PMAPART
Overhead okayed for cover per activity notes 6/8.
FIR06-00385 FIR-Aging Inspection6/17/20096/17/20096/17/2009 1:17:25 PMADONE
BLD09-00600 FIRE-Final Inspection6/16/20096/17/20096/17/2009 1:17:08 PMAPASS
Life safety inspection passed after corrections made while on site including removal of a manual flush bolt at the main entry/exit door. Contractor to post "door to remain......." sign prior to structural final for verification at that time.