ESC09-00298
| Site Preparation ESC | 6/17/2009 | 6/17/2009 | 6/17/2009 4:21:34 PM | | PART |
|
|
Went over the plan with Mike Hart with C&A Paving. Discussed with hi,m over the alterations to the ESC plan and eliminating certain BMP's where in is not threatening any water convences or protected areas. Told him that all storm drain inlets within the area of impact of the project need to be protected and documented on the ESC plan also by the RP of the project area. Will re-inspect on 6/19/09 PM.
|
ESC08-00700
| General Inspection | 6/17/2009 | 6/17/2009 | 6/17/2009 4:17:26 PM | P | CANC |
|
|
Wrong permit
|
ESC09-00326
| Site Preparation ESC | 6/17/2009 | 6/17/2009 | 6/17/2009 4:13:10 PM | | PASS |
|
|
|
ESC09-00286
| Random Inspection | 6/17/2009 | 6/17/2009 | 6/17/2009 1:08:36 PM | A | DONE |
|
|
Message to RP: Recommended to the RP to stabilize the overflow area in the 2nd basin that is being utilized while the 1st basin is being constructed. Also if the water being contained within the basin breaches the overflow to monitor the dischage.
|
ESC09-00240
| General Inspection | 6/17/2009 | 6/17/2009 | 6/17/2009 11:26:18 AM | P | CANC |
|
|
Verbal to RP: Maintain storm drain ilet after next set of storms today. Will re-inspect on 6/19/09AM.
|
ESC09-00276
| Site Preparation | 6/17/2009 | 6/17/2009 | 6/17/2009 11:25:53 AM | | NR |
|
|
Project has not started but there already is a exsisting project occuring. ESC09-00240 Verbal to RP: Maintain storm drain ilet after next set of storms today. Will re-inspect on 6/19/09AM.
|
ESC09-00022
| Site Preparation | 6/17/2009 | 6/17/2009 | 6/17/2009 10:48:52 AM | | FAIL |
|
|
Verbal to RP: 1.Provide a concrete washout pit. 2.Clean up all concrete washout residual remove or place into a washout pit as soon as provided. 3.Clean up all hard surfaces of all sediment and debris off of all hard surfaces. Will re-inspect on 9/19/09 AM.
|
ESC09-00334
| Site Preparation | 6/17/2009 | 6/17/2009 | 6/17/2009 9:39:37 AM | | NR |
|
|
Site preperation inspect will occur with the footing inspection.
|
ESC08-00539
| BMP Violation | 6/15/2009 | 6/17/2009 | 6/17/2009 9:32:07 AM | A | PART |
|
|
A relief trench and used exsisting wattle in areas where is over a 2% grade slope.
|
ESC09-00225
| Tracking Control | 6/16/2009 | 6/17/2009 | 6/17/2009 9:30:56 AM | A | PASS |
|
|
|
ESC07-00986
| BMP Violation | 6/16/2009 | 6/17/2009 | 6/17/2009 9:30:43 AM | A | PASS |
|
|
All sediment and debris have been cleaned up and a earth berm was established.
|
ESC06-01881
| DOC - Permit Finaled | 6/17/2009 | 6/17/2009 | 6/17/2009 7:40:49 AM | P | PASS |
|
|
|