Inspections for the day of: Tuesday, June 17, 2014.
Number of inspections: 22
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD13-03513 BLD-Framing/Rough-in6/16/20146/17/20146/17/2014 4:22:43 PMPNR
Call prior to inspection Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD13-03514 BLD-Framing/Rough-in6/16/20146/17/20146/17/2014 4:22:28 PMPNR
Phone #: ###-#### >> Inspection requested via web by Brian Stark
GCB14-00015 GCB-Framing6/17/20146/17/20146/17/2014 3:19:01 PMPCANC
Dan ###-#### plans in fireplace at 46 East 51st
GCB14-00017 GCB-Framing6/17/20146/17/20146/17/2014 3:18:50 PMPCANC
Dan ###-#### plans in fireplace
GCB14-00015 GCB-Energy6/17/20146/17/20146/17/2014 3:18:27 PMPPASS
Dan ###-#### plans in fireplace at 460 E 51st
GCB14-00017 GCB-Energy6/17/20146/17/20146/17/2014 3:18:07 PMPPASS
Dan ###-#### plans in fireplace
BLD13-01688 BLD-Framing/Rough-in6/17/20146/17/20146/17/2014 3:17:45 PMPPART
Charles Phone #: ###-####. Interior steel stud walls phase 2 part B eqiupment storage B144 restrooms D104, D105 and North wall at room 107.
BLD14-00172 BLD-Ceiling Grid Inspection6/17/20146/17/20146/17/2014 2:08:38 PMPNR
Drew Phone #: ###-####. Needs trades rough in insp[ections.
BLD14-01156 BLD-Footing6/12/20146/17/20146/17/2014 11:31:54 AMADEFR
Pouring at 9/requests early - Bernie Phone #: ###-####. Pending special inspection.
BLD14-01555 BLD-Conference6/17/20146/17/20146/17/2014 11:06:40 AMADONE
Phone #: ###-#### >> Inspection requested via web by Chris Howell
BLD14-01555 DOC - Permit Finaled6/17/20146/17/20146/17/2014 11:06:30 AMPPASS
All work appeared to be done in accordance with local codes and ordinances.
BLD14-00961 BLD-Conference6/16/20146/17/20146/17/2014 11:01:18 AMADONE
Eric Phone #: ###-####. No one on site, no plans on site. Footing work appeared incomplete. Attempted to call eric, could not leave voice mail, mail box was full. Will need to reschedule. Went back to meet concrete subcontractor. Concerns about condition of existing wall. From engineers details, it appeears that new footing and wall is going to support existing floor. Noted to contractor if he still has concerns, he needs to contact the engineer for further investigation on existing concrete wall.
BLD14-00908 BLD-Framing/Rough-in6/17/20146/17/20146/17/2014 10:37:42 AMAFAIL
Framing inspection please Phone #: ###-#### >> Inspection requested via web by Joshua Edwards. Airseal at low voltage wires, complete lateral bracing on C8 truss, fireblock fireplace at ceiling. ok to insulate, correction notice posted.
ESC13-01264 Site Final6/17/20146/17/20146/17/2014 10:10:38 AMADONE
ESC13-01264 DOC - Permit Finaled6/17/20146/17/20146/17/2014 10:10:28 AMPPASS
BLD13-03493 BLD-Final6/17/20146/17/20146/17/2014 10:08:00 AMAPASS
Garage code is 2224 Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
BLD13-03493 DOC - Permit Finaled6/17/20146/17/20146/17/2014 10:07:25 AMPPASS
BLD13-02792 BLD-Foundation6/16/20146/17/20146/17/2014 9:45:34 AMADONE
Advardo Phone #: ###-####
BLD13-03527 BLD-Wall cover6/16/20146/17/20146/17/2014 8:52:57 AMAPASS
Firewall assembly. Please inspect between 9-10 am. Phone #: ###-#### >> Inspection requested via web by Brian Stark. 3rd floor firewalls.
BLD13-03526 BLD-Wall cover6/16/20146/17/20146/17/2014 8:52:34 AMAPASS
Firrwall Phone #: ###-#### >> Inspection requested via web by Brian Stark. 3rd floor firewalls.
BLD13-03525 BLD-Wall cover6/16/20146/17/20146/17/2014 8:52:06 AMAPASS
Firewall Phone #: ###-#### >> Inspection requested via web by Brian Stark. 3rd floor firewalls.
BLD13-03524 BLD-Wall cover6/16/20146/17/20146/17/2014 8:51:43 AMAPASS
Firewall Phone #: ###-#### >> Inspection requested via web by Brian Stark. 3rd floor firewalls.