ESC13-00302
| Complaint Inspection | 6/17/2014 | 6/17/2014 | 6/17/2014 4:41:05 PM | P | FAIL |
|
|
Complaint called in to code enforcement by neighborhood resident. Code enforcement referred to me.
Work is in progress at site. Permit is posted. Project has been underway for 14+ months. There is a need for improved daily housekeeping at the site.
Written CN posted on GC's sign:
Corrections:
1. Sweep gutters on both side of street 2. Provide waste container for cigarrette butts and other litter. Only a few butts observed. 3. Daily housekeeping should be performed at end of each day that construction activity takes place.
Will re-inspect. Thursday 6/19 is day of compliance.
|
ESC13-00647
| DOC - Permit Finaled | 6/17/2014 | 6/17/2014 | 6/17/2014 4:14:01 PM | P | PASS |
|
|
|
ESC13-00647
| General Inspection | 6/17/2014 | 6/17/2014 | 6/17/2014 4:12:58 PM | | PASS |
|
|
Dentist office is complete and occupied. The permit and Guho construction sign is still on site on the adjacent parcel. Parking lot and drainage facility improvements complete. Cleared parcel is 665 Parkcenter and looks to be prepped for furture development. Graded and stabilized with gravel. No further ESC inspections required.
|
ESC14-00058
| General Inspection | 6/17/2014 | 6/17/2014 | 6/17/2014 12:33:34 PM | | PASS |
|
|
House frame is built. Interior work remaining. Permit posted and BMPs in good condition. No sediment observed exiting site. No corrections at this time.
|
ESC13-00472
| Aging Inspection | 6/17/2014 | 6/17/2014 | 6/17/2014 12:25:38 PM | | PASS |
|
|
Finaled.
|
ESC13-00472
| DOC - Permit Finaled | 6/17/2014 | 6/17/2014 | 6/17/2014 12:25:24 PM | P | PASS |
|
|
House complete and landscaped. No ESC issues on site. BLD permit already finaled. No further ESC inspections required.
|
ESC09-00352
| General Inspection | 6/17/2014 | 6/17/2014 | 6/17/2014 10:53:56 AM | | PASS |
|
|
No changes to site. No violations. Brighton's CGP #IDR12BJ34 is still open. City of Boise CGP has been terminated. Will continue to monitor. It is noted that any new development west of the park along Barber Station will need new permits.
|
ESC13-01073
| Aging Inspection | 6/17/2014 | 6/17/2014 | 6/17/2014 10:50:22 AM | | PASS |
|
|
House is complete. Landscaping and stabilization is in progress. Will be ready to close by next inspection. No violations observed.
|
ESC13-00230
| General Inspection | 6/17/2014 | 6/17/2014 | 6/17/2014 10:36:20 AM | | PASS |
|
|
RH #5 is in full progress with over 50% parcel complete or with active construction.
Roads are relatively clean and storm drains have protection. Concrete washout line pit is in good condition and being utilized.
No discharges, trackout or other violations observed at time of inspection. Approved.
|
ESC14-00144
| General Inspection | 6/17/2014 | 6/17/2014 | 6/17/2014 10:32:44 AM | | PASS |
|
|
Underground utilities in first East Valley Sub have been mostly installed. Starting work on the roads , gutters and sidewalk. Permiter wattles line Warm Springs. Construction entrance rock is piled on site, but the entrance has not been installed. No trackout issues apparent at site. Will continue to monitor. No dust seen crossing Highland Valley Road or Warm Springs. No corrections required at this time.
|
ESC14-00238
| General Inspection | 6/17/2014 | 6/17/2014 | 6/17/2014 10:30:37 AM | | PASS |
|
|
Finaled.
|
ESC14-00238
| DOC - Permit Finaled | 6/17/2014 | 6/17/2014 | 6/17/2014 10:29:39 AM | P | PASS |
|
|
Utilities (sewer/water) have been extended out to East Valley Sub. Warm Springs has been repatched and shoulders restored. Constrution materials and BMPs have been removed. No further construction for this permit. See ESC14-00144 for East Valley Sub main site ESC permit.
|
ESC14-00206
| Random Inspection | 6/17/2014 | 6/17/2014 | 6/17/2014 10:10:45 AM | A | PASS |
|
|
Permit posted and BMPs installed for Sunny Ridge #3. No trackout to Snow Bird or Columbia Rd. No dust issues observed at time of inspection and no citizen complaints at this time.
|
ESC13-00552
| BMP Violation | 6/17/2014 | 6/17/2014 | 6/17/2014 10:07:21 AM | P | PART |
|
|
Streets, gutters and sfh projects are staying in compliance with ESC conditions. The main violation observed was the concrete washout which is full. There was no liquified concrete in pit at time of inspection and did not observe any new foundations being poured this week.
Verbal correction to developer Brad M. to provide new washout for upcoming homes. He said it would be completed by early next week. Will check back at that time.
Note: Low risk site, washout not near any surfacae waters or stormwater drainage structures. Just needs to be removed and new lined pit provided.
|
ESC13-00925
| General Inspection | 6/16/2014 | 6/17/2014 | 6/17/2014 9:48:58 AM | P | PASS |
|
|
Pool area at Sunny Ridge is near completion. Sod has been placed around the outside permiter and the parking lot is complete. Some minor work remaining on pool.
|
ESC13-01084
| DOC - Permit Finaled | 6/17/2014 | 6/17/2014 | 6/17/2014 9:37:07 AM | P | PASS |
|
|
Project complete. New asphalt and other improvements installed. No ESC violations at site. BLD finaled.
|
ESC13-01088
| Aging Inspection | 6/17/2014 | 6/17/2014 | 6/17/2014 9:13:36 AM | | PASS |
|
|
Finaled.
|
ESC13-01088
| DOC - Permit Finaled | 6/17/2014 | 6/17/2014 | 6/17/2014 9:13:24 AM | P | PASS |
|
|
Construction complete and BLD permit finaled. All exterior disturbance has been stabilized. ESC conditions satisfied.
|
ESC13-01084
| Aging Inspection | 6/17/2014 | 6/17/2014 | 6/17/2014 8:39:27 AM | | PASS |
|
|
|