FIR15-00056
| INSP-Final Inspection | 6/16/2015 | 6/17/2015 | 6/17/2015 2:31:32 PM | A | FAIL |
|
|
Contractors scope of work complete, end of line voltage verifyed and acceptable. Horns and strobes from contractors scope to main floor as well as other area's on main floor are not synced together, flashing and sounding at different times. Contractor is aware of issue, instructed the on site point of contact, Randy, phone ####-#### will not final until issue is addressed/corrected.
|
FIR15-00386
| INSP-Final Inspection | 6/16/2015 | 6/17/2015 | 6/17/2015 2:27:03 PM | P | PASS |
|
|
Fire alarm test & inspection passed/complete
|
FIR15-00378
| INSP-Final Inspection | 6/17/2015 | 6/17/2015 | 6/17/2015 1:39:20 PM | P | PART |
|
|
Notated areas that are finaled with red pen on the city approved drawings Still have other areas on the floor that needs to be rough in inspected as well as finaled.
|
BLD15-01211
| FIRE-Final Inspection | 6/16/2015 | 6/17/2015 | 6/17/2015 9:53:46 AM | A | PASS |
|
|
Life fire safety passed/complete
|
FIR15-00325
| INSP-Final Inspection | 6/17/2015 | 6/17/2015 | 6/17/2015 9:53:07 AM | A | PASS |
|
|
Fire sprinkler inspection passed/complete
|
FIR14-00265
| INSP-Final Inspection | 6/15/2015 | 6/17/2015 | 6/17/2015 9:20:47 AM | A | PASS |
|
|
Fire sprinkler inspection passed/complete
|
FIR14-00304
| INSP-Final Inspection | 6/15/2015 | 6/17/2015 | 6/17/2015 9:19:15 AM | A | PASS |
|
|
Fire sprinkler inspection passed/complete
|