ELE16-01837
| Electrical Rough-In | 6/16/2016 | 6/17/2016 | 6/17/2016 3:41:41 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Terry Scott Addition rough in ok cover
|
ELE16-01675
| Electrical Rough-In | 6/13/2016 | 6/17/2016 | 6/17/2016 3:18:13 PM | P | FAIL |
|
|
Call half hour before to meet // James Phone #: ###-#### 334.30- NM shall be secured with in 12" of boxes, cans and few receptacles. 10-2 and 12-2 shall be removed from cold air return 210.52- Receptacle shall be located in wall space to right of laundry. NM cable shall be located in dwall space around laundry area. Junction boxes in ceiling shall remain accessible.
|
ELE16-01511
| Final | 6/15/2016 | 6/17/2016 | 6/17/2016 2:34:24 PM | P | FAIL |
|
|
Darren Phone #: ###-#### Contactor informed me that person doing finish work installed the electrical and requested inspection from previous day. Pop up receptacles in desk top shall also be tamper resistant type.
|
ELE15-00495
| Electrical Rough-In | 6/17/2016 | 6/17/2016 | 6/17/2016 2:02:19 PM | P | PASS |
|
|
Ceiling cover inspection. Can lights and LEDs in south breezeway at GBAD. Eric Gibson is contact. ###-####. Phone #: ###-#### Inspection requested via web by Toby Groves Beezeway from capitol to grove center to 5 column only lid rough in ok cover
|
ELE16-01799
| Electrical Rough-In | 6/16/2016 | 6/17/2016 | 6/17/2016 1:27:13 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kendall bender Panel wall to be left open for feeder conduit. Wall rough in ok cover
|
ELE16-01912
| Electrical Rough-In | 6/16/2016 | 6/17/2016 | 6/17/2016 12:48:01 PM | A | PASS |
|
|
Partial rough in. Chris is contact. 3rd floor. Thanks Phone #: ###-#### Inspection requested via web by Chris Chesnut 301 thru 310 fir out walls rest will be fished in rough in ok cover
|
ELE13-01291
| Electrical Rough-In | 6/17/2016 | 6/17/2016 | 6/17/2016 11:56:32 AM | P | PASS |
|
|
underground inspection in event lawn. call Frank Phone #: ###-#### Inspection requested via web by Brandon Robinson Underground north and east corners rough in ok cover
|
ELE16-01838
| Electrical Rough-In | 6/16/2016 | 6/17/2016 | 6/17/2016 11:53:06 AM | A | PASS |
|
|
level 5 stacks 2,3, and 4 ceiling rough in Phone #: ###-#### Inspection requested via web by Brandon Robinson 2nd floor S. offices and 2 records and receiving rooms and a conference room as noted on contractor print. 5th floor as noted and marked on contractor print grid rough in ok cover
|
ELE16-00089
| Electrical Rough-In | 6/16/2016 | 6/17/2016 | 6/17/2016 11:01:47 AM | A | PASS |
|
|
Call Bob for R/I inspection of north wall on 4th floor in ballroom area. Phone #: ###-#### Inspection requested via web by Rafael Castillo Prefunction room 453 west wall rough in ok cover
|
ELE15-03441
| Final | 6/16/2016 | 6/17/2016 | 6/17/2016 9:37:53 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by mike brown Final ok
|
ELE16-01730
| Electrical Rough-In | 6/17/2016 | 6/17/2016 | 6/17/2016 8:54:55 AM | A | PASS |
|
|
Ceiling rough in Phone #: ###-#### Inspection requested via web by Brandon Winters Grid rough in ok cover
|