ELE16-01360
| Electrical Rough-In | 6/15/2016 | 6/17/2016 | 6/17/2016 3:16:01 PM | P | CANC |
|
|
Final inspection on 200 AMP service scheduled for the same afternoon. Phone #: ###-#### Inspection requested via web by Steven Reames not ready
|
ELE16-01591
| Final | 6/15/2016 | 6/17/2016 | 6/17/2016 3:15:00 PM | P | CANC |
|
|
Attempting to schedule rough-in/final inspection on hot tub portion around same time. Phone #: ###-#### Inspection requested via web by Steven Reames needed r/i and not ready at this time
|
ELE16-01591
| Electrical Rough-In | 6/17/2016 | 6/17/2016 | 6/17/2016 3:14:50 PM | P | PASS |
|
|
Attempting to schedule rough-in/final inspection on hot tub portion around same time. Phone #: ###-#### Inspection requested via web by Steven Reames underground for pool ok cover
|
ELE16-01873
| Final | 6/17/2016 | 6/17/2016 | 6/17/2016 2:58:22 PM | P | CANC |
|
|
final for electrical on the remodel Phone #: ###-#### Inspection requested via web by Shane Dale Needed r/i
|
ELE16-01873
| Electrical Rough-In | 6/17/2016 | 6/17/2016 | 6/17/2016 2:57:54 PM | P | FAIL |
|
|
final for electrical on the remodel Phone #: ###-#### Inspection requested via web by Shane Dale 348.30 FMC shall be securely fastened within 12" of a box and not exceed 4 1/2' 300.4(2) notches in wood where a cable is ran through it shall have a listed nail plate to protect form physical damage
|
ELE16-01165
| Electrical Rough-In | 6/17/2016 | 6/17/2016 | 6/17/2016 2:09:06 PM | P | PASS |
|
|
Wall and soffit cover. Danny is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen Walls and soffits as noted on print ok cover
|
ELE16-01902
| Electrical Rough-In | 6/15/2016 | 6/17/2016 | 6/17/2016 1:49:56 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Patrick Paz kitchen and laundry rough-in ok cover
|
ELE16-01686
| Final | 6/17/2016 | 6/17/2016 | 6/17/2016 1:27:41 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Patrick Paz Final for up bath ok
|
ELE16-01924
| Conference | 6/17/2016 | 6/17/2016 | 6/17/2016 1:03:58 PM | P | DONE |
|
|
Micah Phone #: ###-#### Discussed service change requirments. changing overhead to u/g. will call for another conference once has full scope of work figured out.
|
ELE16-01844
| Final | 6/17/2016 | 6/17/2016 | 6/17/2016 11:57:19 AM | P | CANC |
|
|
Please call general (Adam ###-####) before heading there. Phone #: ###-#### Inspection requested via web by Barbara Szurgot Needed r/i
|
ELE16-01844
| Electrical Rough-In | 6/17/2016 | 6/17/2016 | 6/17/2016 11:57:12 AM | P | PASS |
|
|
Please call general (Adam ###-####) before heading there. Phone #: ###-#### Inspection requested via web by Barbara Szurgot Kitchen rough-in ok cover
|
ELE16-00668
| Final | 6/16/2016 | 6/17/2016 | 6/17/2016 11:43:05 AM | A | FAIL |
|
|
Garage code is JAYO enter Phone #: ###-#### Inspection requested via web by Zane Robertson Master vanity lights need hung 410.10 lights within 8' of bathtub shall be listed and have proper lamp installed
|
ELE16-01884
| Rough-In Permanent Service | 6/16/2016 | 6/17/2016 | 6/17/2016 11:23:18 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Zane Robertson Rough-in ok cover p/s u/g n ok
|
ELE16-01257
| Electrical Rough-In | 6/17/2016 | 6/17/2016 | 6/17/2016 10:49:05 AM | A | PASS |
|
|
New addition, bathroom floor heat mat. Phone #: ###-#### Inspection requested via web by Jarod Murray Master bath floor heat only ok cover
|
ELE16-01440
| Permanent Service | 6/16/2016 | 6/17/2016 | 6/17/2016 10:28:06 AM | A | PASS |
|
|
new panel to replace existing, need permanat service connection Phone #: ###-#### Inspection requested via web by JENNY EMEL Second ground rod will be looked at for final ID design personnel stated overhead feed was fine p/s o/h rc ok
|
ELE16-01537
| Electrical Rough-In | 6/16/2016 | 6/17/2016 | 6/17/2016 10:10:37 AM | A | PASS |
|
|
Fourth floor ceilings only Phone #: ###-#### Inspection requested via web by mike brown 4th floor cielings ok cover
|
ELE16-01491
| Electrical Rough-In | 6/16/2016 | 6/17/2016 | 6/17/2016 9:29:49 AM | A | PASS |
|
|
We are requesting a ceiling rough-in inspection for tomorrow 6/17/16 about mid-morning if possible. Our contact is Rich @ ###-####. Thank you, Phone #: ###-#### Inspection requested via web by Clint Tate Areas as noted on EC print cielings ok cover
|
ELE16-01418
| Final | 6/16/2016 | 6/17/2016 | 6/17/2016 8:56:30 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wake Correction fixed final ok
|
ELE16-01717
| Final | 6/16/2016 | 6/17/2016 | 6/17/2016 8:29:58 AM | A | PASS |
|
|
key box is side or back of building by gas meters and code is 1512 Phone #: ###-#### Inspection requested via web by ron spen cer Final for front two offices ok(cieling was existing that why there was no cieling inspection done)
|
ELE13-00373
| ELE-Aging Inspection | 6/17/2016 | 6/17/2016 | 6/17/2016 7:31:01 AM | | CANC |
|
|
too busy
|
ELE12-02580
| ELE-Aging Inspection | 6/17/2016 | 6/17/2016 | 6/17/2016 7:30:40 AM | | CANC |
|
|
too busy
|
ELE13-00755
| ELE-Aging Inspection | 6/17/2016 | 6/17/2016 | 6/17/2016 7:30:21 AM | | CANC |
|
|
too busy
|