Inspections for the day of: Friday, June 17, 2016.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-01914 BLD-Framing/Rough-in6/17/20166/17/20166/20/2016 3:23:04 PMPPASS
3rd floor // Steve Phone #: ###-####
BLD16-00244 BLD-Framing/Rough-in6/17/20166/17/20166/20/2016 3:22:48 PMPPART
Bob-partial frame on 4th floor Phone #: ###-#### 4th floor ok to insulate
BLD16-01396 BLD-Footing6/17/20166/17/20166/17/2016 3:33:39 PMPPASS
Jeramie Phone #: ###-####
BLD15-02185 BLD-Final6/16/20166/17/20166/17/2016 3:27:54 PMPPASS
Clive Phone #: ###-####-if no one is there call Clive for access and pleae where booties at garage door
BLD15-02185 DOC - Permit Finaled6/17/20166/17/20166/17/2016 3:27:45 PMPPASS
BLD16-01097 BLD-Other6/16/20166/17/20166/17/2016 3:07:55 PMPPASS
SHEAR inspection Phone #: ###-#### Inspection requested via web by Admin Assistant
BLD15-04205 BLD-Conference6/16/20166/17/20166/17/2016 1:14:48 PMAPASS
Inspection request for wood blocking in units. Phone #: ###-#### Inspection requested via web by Carl Benjamin talked about backing in walls
BLD16-00307 BLD-Foundation6/16/20166/17/20166/17/2016 1:12:48 PMAPEND
Rebar wall inspection west wall U.8 from 25.5 to 30-line.
Rebar slab inspection S to M.5 from 30.5 to 37.5-line. Phone #: ###-#### Inspection requested via web by gogi gwardschaladse ok after s/i signs off
GCB14-00062 GCB-Final6/16/20166/17/20166/17/2016 1:11:17 PMPPASS
Miquel ###-####
BLD15-03621 BLD-Wall cover6/15/20166/17/20166/17/2016 10:12:45 AMAPART
Shear // Joel Phone #: ###-#### ext penthouse ok to cover
BLD15-03621 BLD-Framing/Rough-in6/15/20166/17/20166/17/2016 10:11:58 AMAPART
Joel Phone #: ###-#### ext penthouse
BLD15-04022 BLD-Foundation6/17/20166/17/20166/17/2016 9:30:37 AMAPASS
Phone #: ###-####
BLD16-01226 BLD-Framing/Rough-in6/16/20166/17/20166/17/2016 9:30:01 AMAPASS
would like call ahead; Tim Phone #: ###-####
BLD16-00666 BLD-Conference6/17/20166/17/20166/17/2016 8:42:44 AMADONE
To discuss ''shaft'' fire rated wall/ceiling assembly. Please call 15 minutes before inspection. Thanks, Phone #: ###-#### Inspection requested via web by Nic van Diepen
BLD16-01364 BLD-Foundation6/16/20166/17/20166/17/2016 12:00:00 AMACANC
Rebar // Randy Phone #: ###-####