ELE02-01812
| Temporary Service | 6/17/2002 | 6/18/2002 | 6/18/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/17/2002 at 11:55:03. Contact: ###-####.
t/s u/g new ok 6/18/2002 11:07:11 AM
|
ELE02-01681
| Electrical Rough-In | 6/17/2002 | 6/18/2002 | 6/18/2002 12:00:00 AM | A | PART |
|
|
mike ###-#### conf only ok 6/17/2002 4:13:12 PM
|
ELE02-01825
| Electrical Rough-In | 6/17/2002 | 6/18/2002 | 6/18/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/17/2002 at 17:03:25. Contact: ###-####. cor. posted called left message 300.4, 110.14(B), 300.14 cow need too meet with contractor at job site for circuiting info in kitchen 6/18/2002 10:53:19 AM
|
ELE02-01696
| Electrical Rough-In | 6/18/2002 | 6/18/2002 | 6/18/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/18/2002 at 07:08:14. Contact: ###-####. 5 light pole bases ok 6/18/2002 11:35:10 AM
|
ELE02-01138
| Final | 6/18/2002 | 6/18/2002 | 6/18/2002 12:00:00 AM | P | FAIL |
|
|
###-#### called no SMS for grding, and needs bushing where conductors enter sign base waiting for call from sign company 6/18/2002 2:32:58 PM
|
ELE02-01832
| Electrical Rough-In | 6/18/2002 | 6/18/2002 | 6/18/2002 12:00:00 AM | P | PART |
|
|
###-#### Nolan Conference ok only no r/i 6/18/2002 3:19:03 PM
|
ELE02-01546
| Rough-In Permanent Service | 6/17/2002 | 6/18/2002 | 6/18/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/17/2002 at 15:05:44. Contact: ###-####. some boxes not set flush with sheet rock, I let them know all other boxes shall be flush r/i ok 6/18/2002 4:59:36 PM
|
ELE02-01782
| Final | 6/13/2002 | 6/18/2002 | 6/18/2002 12:00:00 AM | P | PASS |
|
|
marv - ###-#### lights in kit. ok 6/18/2002 3:59:30 PM
|
ELE00-04435
| Electrical Rough-In | 6/13/2002 | 6/18/2002 | 6/18/2002 12:00:00 AM | P | NH |
|
|
conf ###-#### called left message no response 6/18/2002 4:32:15 PM
|