Inspections for the day of: Tuesday, June 18, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-01717 Water and/or Sewer6/17/20026/18/20026/18/2002 12:00:00 AMAPASS
###-####
PLM02-01782 Sprinkler (Final)6/17/20026/18/20026/18/2002 12:00:00 AMAPASS
larry ###-#### backflow
PLM01-02033 Water and/or Sewer6/17/20026/18/20026/18/2002 12:00:00 AMAPASS
CLINT ###-#### MAN HOLE SEWER
PLM02-01788 Water and/or Sewer6/18/20026/18/20026/18/2002 12:00:00 AMPPASS
dan miller ###-####
PLM02-01787 Final6/18/20026/18/20026/18/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 06/18/2002 at 08:48:17. Contact: ###-####.
PLM01-02014 Final6/18/20026/18/20026/18/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 06/18/2002 at 09:00:41. Contact: ###-####. loop dw drain to counter top heigh 6/18/2002 4:59:29 PM and secure, calk master lav and both 6/18/2002 4:59:44 PM showers, reset pedistal lav and pedistal plumb 6/18/2002 5:26:51 PM
PLM02-01793 Plumbing Rough-in6/18/20026/18/20026/18/2002 12:00:00 AMPPART
micky ###-#### tie in only 6/18/2002 11:39:28 AM
PLM01-03932 Sprinkler (Final)6/18/20026/18/20026/18/2002 12:00:00 AMPPASS
###-#### or ###-#### says ok to cover on 4/2/02
PLM02-00834 Final6/18/20026/18/20026/18/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 06/18/2002 at 10:52:13. Contact: ###-####.
PLM02-01787 Plumbing Rough-in6/18/20026/18/20026/18/2002 12:00:00 AMPPASS
Added by Inspector: 330 On 6/18/2002 12:21:05 PM ri ok
PLM02-01777 Sprinkler (Final)6/17/20026/18/20026/18/2002 12:00:00 AMPPASS
###-#### lyla