Inspections for the day of: Tuesday, June 18, 2002.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS02-00156 FIR-Final6/17/20026/18/20026/18/2002 12:00:00 AMAFAIL
###-#### exiting from sales floor and garage problems; occupancy separation walls aren't one hour as shown on plans; need architect input; left c/n 6/18/2002 11:46:13 AM
BLD01-02991 FIRE-Final Inspection6/17/20026/18/20026/18/2002 12:00:00 AMAPASS
RICK ###-####
BLD02-00477 FIRE-Hydro test above ground6/17/20026/18/20026/18/2002 12:00:00 AMANR
###-#### adrian
BLD02-00314 FIRE-Final Inspection6/17/20026/18/20026/18/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 06/17/2002 at 17:31:43. Contact: ###-####. GC called and said they aren't ready 6/18/2002 1:22:07 PM
BLD02-00545 FIRE-Sprinkler Rough-in6/18/20026/18/20026/18/2002 12:00:00 AMAPASS
Added by Inspector: 409 On 6/18/2002 10:52:43 AM okay to cover
FIR02-00093 INSP-Final Inspection6/18/20026/18/20026/18/2002 12:00:00 AMPPASS
Added by Inspector: 409 On 6/18/2002 2:31:05 PM
FIR02-00071 INSP-Final Inspection6/18/20026/18/20026/18/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 06/18/2002 at 07:32:49. Contact: ###-####.
FIR02-00212 INSP-Final Inspection6/18/20026/18/20026/18/2002 12:00:00 AMPPASS
fn don -pager- ###-####
FIR01-00298 INSP-Final Inspection6/18/20026/18/20026/18/2002 12:00:00 AMPNR
###-####
FIR02-00201 INSP-Final Inspection6/18/20026/18/20026/18/2002 12:00:00 AMPPASS
###-####
FIR02-00130 INSP-Sprinkler Rough-in/Hydro6/17/20026/18/20026/18/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 06/17/2002 at 16:56:27. Contact: ###-####. met with Mike; will need resubmittals for clean room 6/18/2002 4:52:27 PM