Inspections for the day of: Tuesday, June 18, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-01944 BLD-Framing/Rough-in6/17/20026/18/20026/18/2002 12:00:00 AMAPART
alan ###-#### Shear--Ok to side. 6/18/2002 11:07:08 AM
BLD02-00115 BLD-Final6/17/20026/18/20026/18/2002 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 06/17/2002 at 13:50:07. Contact: ###-####. C/N on site. 6/18/2002 10:03:29 AM
MEC02-00653 Final6/17/20026/18/20026/18/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 06/17/2002 at 14:42:02. Contact: ###-####.
MEC02-00762 Final6/18/20026/18/20026/18/2002 12:00:00 AMAPASS
Scheduled by Inspector: 420 On 6/18/2002 9:00:48 AM
MEC02-01613 Rough-in6/18/20026/18/20026/18/2002 12:00:00 AMPCANC
###-#### Disp set to [CANC] by a contractor via Hello! on 06/18/2002 at 09:34:49.
BLD02-01255 BLD-Footing6/18/20026/18/20026/18/2002 12:00:00 AMPPART
ft- steve- ###-#### wip-90% ready. 6/18/2002 2:24:13 PM
BLD02-00914 BLD-Framing/Rough-in6/14/20026/18/20026/18/2002 12:00:00 AMPPART
BRIAN ###-#### ok to insulate--Need to complete corrections--hanger on m.lam and fir out wall--upstairs utility. 6/18/2002 4:22:11 PM
BLD02-00914 BLD-Energy code compliance6/14/20026/18/20026/18/2002 12:00:00 AMPNR
BRIAN ###-####
BLD02-00948 BLD-Framing/Rough-in6/17/20026/18/20026/18/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 06/17/2002 at 11:34:21. Contact: ###-####.C/N posted--No approved plans on site. 6/18/2002 3:28:32 PM
BLD02-00912 BLD-Framing/Rough-in6/18/20026/18/20026/18/2002 12:00:00 AMPPART
###-#### terry C/N Ok to insulate. 6/18/2002 2:51:24 PM