FIR07-00812
| INSP-Sprinkler Rough-in/Hydro | 6/18/2008 | 6/18/2008 | 6/18/2008 4:41:05 PM | P | PART |
|
|
UG fire supply line hydrostatic test passed.
|
FIR06-00620
| INSP-Alarm Testing | 6/16/2008 | 6/18/2008 | 6/18/2008 4:40:02 PM | A | PART |
|
|
See locations marked on plan set for heat and smoke detection devices (AC's) tested today at the second floor mechanical level.
|
BLD08-00254
| FIRE-Final Inspection | 6/18/2008 | 6/18/2008 | 6/18/2008 2:23:13 PM | P | PASS |
|
|
Fire life safety passed final inspection.
|
BLD08-00843
| FIRE-Final Inspection | 6/18/2008 | 6/18/2008 | 6/18/2008 2:20:01 PM | P | PART |
|
|
Racking installation is satisfactory, final pending items # 2 and 3 per fire code review including smoke and heat vents required and posting of the 4A10BC fire extinguishers.
|
FIR08-00178
| INSP-Sprinkler Rough-in | 6/18/2008 | 6/18/2008 | 6/18/2008 2:16:57 PM | P | PART |
|
|
See areas on stamped plan set okayed for cover at the drop ceilings, noted two heads alternately spaced from plan locations.
|
FIR08-00420
| INSP-Final Inspection | 6/17/2008 | 6/18/2008 | 6/18/2008 1:05:52 PM | A | PASS |
|
|
Required corrections verified for completion, fire alarm permit finaled.
|
BLD07-02391
| FIRE-Final Inspection | 6/17/2008 | 6/18/2008 | 6/18/2008 12:37:37 PM | A | PASS |
|
|
Corrections verified for compliance, noted building plan modification accepted per revision dated 6/16, fire life safety finaled.
|
BLD08-01215
| FIRE-Conference | 6/18/2008 | 6/18/2008 | 6/18/2008 12:25:20 PM | P | DONE |
|
|
Regarding project completion schedules.
|
FIR08-00368
| FIR-Aging Inspection | 6/18/2008 | 6/18/2008 | 6/18/2008 12:23:34 PM | A | DONE |
|
|
In progress, pending field inspection request for work completed.
|
FIR07-00928
| FIR-Aging Inspection | 6/18/2008 | 6/18/2008 | 6/18/2008 12:22:20 PM | | DONE |
|
|
Site visit confirmed construction underway, work in progress.
|