Inspections for the day of: Wednesday, June 18, 2008.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00194 FIR-Aging Inspection6/18/20086/18/20086/19/2008 10:21:13 AM NR
wip
BLD08-01038 FIRE-Conference6/17/20086/18/20086/19/2008 10:20:02 AMADONE
Exit signs need to be provided at the two warehouse exterior exit doors. Emergency lights at these two doors is optional. The two doors between the offices and warehouse can be secured to prevent warehouse access to the offices. The east exit door from the showroom needs to have single action hardware and the keyed hardware removed.
FIR08-00358 INSP-Final Inspection6/17/20086/18/20086/18/2008 3:59:56 PMPPASS
permit finaled
BLD08-00994 FIRE-Final Inspection6/18/20086/18/20086/18/2008 1:45:19 PMPPASS
life safety passed
BLD08-01152 FIRE-Final Inspection6/18/20086/18/20086/18/2008 1:42:44 PMPPART
A temporary occupancy was given until a fire extinguisher is provided, covers are installed on the electrical outlets, the exit sign is repaired at the main exit and emergency lighting is provided. The non operational exit sign at the rear exit can be removed or repaired. The thumbturn needs to be removed from the rear exit and single action approved hardware provided.
FIR08-00203 INSP-Sprinkler Rough-in/Hydro6/17/20086/18/20086/18/2008 11:47:24 AMAPART
The 24 hour air test passed. The rough-in inspection passed. Two hangers in the west corridor need to be removed from the truss bracing and a missing hanger needs to be installed on the 2" branchline as discussed. Piping can be covered. Some sprinkler heads are overspaced as per the hydraulic calculations but the minumum gpm/psi required for the remote area exceeds the gpm/psi required for the larger square footage of the heads. I spoke to Brian about this issue as well. Piping can be covered. I spoke to the fire sprinkler contractor about the requirement for the forward flush and a 200lb hydro test.