FIR09-00353
| INSP-Final Inspection | 6/17/2009 | 6/18/2009 | 6/18/2009 2:49:59 PM | P | CANC |
|
|
Tim Christopherson Phone #: ###-#### Internet Inspection Request from: Diane Turner
|
BLD07-01834
| FIRE-Final Inspection | 6/18/2009 | 6/18/2009 | 6/18/2009 2:42:50 PM | P | PART |
|
|
The offices and multipurpose room at the main entry life safety inspections have passed.
|
FIR09-00381
| INSP-Alarm Testing | 6/18/2009 | 6/18/2009 | 6/18/2009 2:41:33 PM | P | PART |
|
|
The the lasted version of the city approved plans for devices tested. They include the new cafeteria and the main entry way offices and multipurpose room.
|
FIR09-00339
| INSP-Sprinkler Rough-in/Hydro | 6/17/2009 | 6/18/2009 | 6/18/2009 2:40:06 PM | A | PASS |
|
|
The sprinkler rough-in passed. The sprinkler piping can be covered.
|
FIR09-00076
| FIR-Aging Inspection | 6/18/2009 | 6/18/2009 | 6/18/2009 9:19:56 AM | | NR |
|
|
Work is in progress
|