ESC09-00113
| General Inspection | 5/18/2009 | 6/18/2009 | 6/19/2009 11:08:37 AM | A | FAIL |
|
|
Verbal to RP: obtain permit for the area to the east of project where stockpile of materail and debris. Must be complete by 6/24/09PM. Will re-inspect on 6/25/09AM.
|
ESC09-00114
| General Inspection | 5/18/2009 | 6/18/2009 | 6/19/2009 11:08:25 AM | A | FAIL |
|
|
Verbal to RP: obtain permit for the area to the east of project where stockpile of materail and debris. Must be complete by 6/24/09PM. Will re-inspect on 6/25/09AM.
|
ESC09-00104
| Site Preparation | 6/17/2009 | 6/18/2009 | 6/18/2009 4:19:11 PM | A | PART |
|
|
Verbal to RP: 1.Fasten the silt fence to the additional post on the outside. 2. Remove all external rockbag on storm drain inlet protection. Will re-inspect on 6/22/09 AM.
|
ESC09-00339
| Random Inspection | 6/18/2009 | 6/18/2009 | 6/18/2009 4:17:06 PM | P | FAIL |
|
|
verbal to RP: Remove all sediment debris off of all haerd surface where the land berm was established for un loading of equiptment. Will re-inspect on 6/22/09 AM
|
ESC09-00160
| Site Preparation | 6/18/2009 | 6/18/2009 | 6/18/2009 1:49:41 PM | | PASS |
|
|
Informed RP to keep any eye on your dust issues.
|
ESC06-01647
| Site Preparation | 6/18/2009 | 6/18/2009 | 6/18/2009 1:23:41 PM | P | CANC |
|
|
|
ESC09-00337
| Site Preparation | 6/18/2009 | 6/18/2009 | 6/18/2009 1:19:43 PM | | PART |
|
|
Verbal to RP: 1. Clean up all sediment off of the street by the end of the day. 2. Re locate porter pottie off of the right away. 3. protect stock pile prior to any storm events. Will re-inspect on 6/22/09 AM.
|
ESC08-00952
| BMP Violation | 6/16/2009 | 6/18/2009 | 6/18/2009 11:34:24 AM | A | PASS |
|
|
|
ESC08-00666
| General Inspection | 6/18/2009 | 6/18/2009 | 6/18/2009 10:48:27 AM | | PART |
|
|
in the process of final landscaping.
|
ESC09-00336
| Site Preparation | 6/18/2009 | 6/18/2009 | 6/18/2009 10:41:39 AM | | NR |
|
|
Site prep inspection will occur with the footing inspection.
|