FIR10-00181
| INSP-Sprinkler Rough-in | 6/18/2010 | 6/18/2010 | 6/18/2010 2:43:36 PM | P | PART |
|
|
Overhead okay for cover at areas marked on approved plans with today's date. Note: Metrology lab is not finished at this time.
|
BLD10-00691
| FIRE-Conference | 6/18/2010 | 6/18/2010 | 6/18/2010 2:40:49 PM | P | DONE |
|
|
Regarding items remaining for fire life safety final and site inspection schedule.
|
FIR10-00283
| INSP-Final Inspection | 6/18/2010 | 6/18/2010 | 6/18/2010 2:37:23 PM | P | PASS |
|
|
Fire sprinkler permit okay for final.
|
FIR10-00283
| INSP-Sprinkler Rough-in | 6/18/2010 | 6/18/2010 | 6/18/2010 2:36:46 PM | P | PART |
|
|
Overhead fire sprinkler modifications per the scope of work approved for cover.
|
BLD10-00645
| FIRE-Final Inspection | 6/18/2010 | 6/18/2010 | 6/18/2010 2:30:36 PM | P | PASS |
|
|
Correction items finished, re-inspection passed. Life safety final approved.
|
FIR10-00270
| INSP-Final Inspection | 6/16/2010 | 6/18/2010 | 6/18/2010 2:29:28 PM | A | PASS |
|
|
Fire alarm work passed field inspection, permit finaled.
|
BLD10-01297
| FIRE-Conference | 6/17/2010 | 6/18/2010 | 6/18/2010 2:25:56 PM | A | DONE |
|
|
On site visit regarding previously issued correction notice items dated 6/14.
|
BLD10-00645
| FIRE-Final Inspection | 6/17/2010 | 6/18/2010 | 6/18/2010 2:25:00 PM | A | FAIL |
|
|
Missing suite address numbers, incorrect sample tube has been installed at the duct smoke detector, provide approved test method for the HVAC DD.
|
BLD10-00885
| FIRE-Final Inspection | 6/17/2010 | 6/18/2010 | 6/18/2010 1:28:06 PM | A | PASS |
|
|
Corrections completed, fire life safety passed.
|