Inspections for the day of: Wednesday, June 18, 2014.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00039 DOC - Permit Finaled6/18/20146/18/20146/18/2014 4:41:54 PMPPASS
Demolition complete by Magnum Demo on this permit. Lot is not stabilized since it is now part of another project at the Boise Auto Mall/ Larry H. Miller dealerships. Magnum no longer on site. Inspection found trouble with another project on site:

At 10 AM this morning, the streets were cleaned improperly with a water truck after dirt dropped out of an end loader. Contractors on job STS and G&B were quick to install BMPs to prevent and filter discharge to MS4 using check dams and DI protection.

Mike from STF presented an temp approval from Josh Wilson (Planning) to work on temporary parking lot. The work will eventually be covered under ESC14-00300.
ESC14-00246 General Inspection6/18/20146/18/20146/18/2014 4:01:21 PM PART
Some sandy sediments have collected at bottom of driveway and in the culdesac. Just needs some sweeping with a pusth broom. No other corrections.
ESC13-01047 Site Preparation6/18/20146/18/20146/18/2014 2:57:14 PMPPASS
Clint Phone #: ###-####

Site is ready for construction. Area BMPs in good condition. No corrections at this time.
ESC14-00264 General Inspection6/18/20146/18/20146/18/2014 10:01:08 AM PASS
Finaled.
ESC14-00264 DOC - Permit Finaled6/18/20146/18/20146/18/2014 10:00:30 AMPPASS
Parking lot repair is complete and stabilized. ESC conditions satisfied. BLD previously finaled.
ESC14-00377 Random Inspection6/18/20146/18/20146/18/2014 9:38:47 AMAPASS
Jackson School demolition is near completion. Some debris remains on the school foundation pad.

No trackout or discharges observed; no further dust complaints since CN was issued.
ESC13-00655 Random Inspection6/18/20146/18/20146/18/2014 9:32:48 AMAPASS
Aberdeen Square development and 4-plexes of central phase is in progress. No trackout, contractors parking on hard surfaces. DIs have inlet protection. Permiter wattles & silt fence installed in certain areas.
ESC13-01020 DOC - Permit Finaled6/18/20146/18/20146/18/2014 9:23:47 AMPPASS
Townhome and detached garage are complete and stabilized. ESC conditions satisfied; BLD finaled.
ESC13-01021 DOC - Permit Finaled6/18/20146/18/20146/18/2014 9:23:13 AMPPASS
Townhome and detached garage are complete and stabilized. BLD finaled. House are sold
ESC14-00283 General Inspection6/18/20146/18/20146/18/2014 9:11:29 AM PASS
BK addition projects in compliance with ESC permits (tennis courts, east wing addition, and library addtion)
ESC13-01021 Aging Inspection6/18/20146/18/20146/18/2014 8:40:25 AM PASS
ESC13-01020 Aging Inspection6/18/20146/18/20146/18/2014 8:39:45 AM PASS