Inspections for the day of: Thursday, June 18, 2015.
Number of inspections: 3
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorThomas Walsh
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00365 INSP-Sprinkler Rough-in/Hydro6/18/20156/18/20156/18/2015 2:40:08 PMPPART
This is a 24 hour air test of six (6) dry pipe valves, as floows;
2nd floor helix, 3rd floor helix, 3rd floor P/G, 4th floor helix, 4th floor P/G and 5th floor helix. Will retest air pressures at 1:30pm on 6/19.
FIR13-00167 INSP-Sprinkler Rough-in/Hydro6/18/20156/18/20156/18/2015 2:37:17 PMPCANC
Wrong permit called in for the systems inspected.
FIR15-00096 INSP-Sprinkler Rough-in6/16/20156/18/20156/18/2015 2:35:03 PMAPART
RTC inspections of the 5th floor south wet and dry pipe systems - see plans for extent of inspection.
NOTE: Dry pipe system protecting the south attic space inspection failed as there are many obstructed sprinklers due to close proximity to draft stops. Many can be easily addressed as the draft stops were located on the wrong truss section. Some others will require adjustments in the sprinkler locations or adding some new heads to provide adequate coverage where heads cannot be moved. See plans were these discrepancies occur.