Inspections for the day of: Monday, June 18, 2018.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDan Ediger
TitlePLM-INSPECTOR
Phone #869-5166
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM17-03715 PLM-Aging Inspection6/18/20186/18/20186/18/2018 4:20:48 PM PEND
contractor to schedule
PLM18-02234 Water Heater Final6/18/20186/18/20186/18/2018 4:16:10 PMPPASS
PLEASE CALL AHEAD ###-#### Phone #: ###-#### Inspection requested via web by Chris Field
PLM18-00008 Final6/18/20186/18/20186/18/2018 4:07:37 PMPFAIL
Final inspection for Lowell Scott job 40116. Contact is Jason ###-####. Phone #: ###-#### Inspection requested via web by Kathy Youngkin.
The t&p drain line must have a 1" or more air gap. It cannot pretude into the floor sink.
PLM18-02445 Final6/15/20186/18/20186/18/2018 3:54:23 PMPFAIL
The customer prefers PM. Please call him when on way so he can meet you onsite. Gordon ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss.
Pressure test is required on the flue.
PLM18-02473 Final6/18/20186/18/20186/18/2018 3:35:22 PMPNR
Later PM. Tyrel ###-#### Phone #: ###-#### Inspection requested via web by Krista Boss rescheduled
PLM18-02528 Water and/or Sewer6/18/20186/18/20186/18/2018 3:07:15 PMPPASS
call first ###-#### for the water connection in the basement.
PLM18-02528 DOC - Permit Finaled6/18/20186/18/20186/18/2018 3:06:44 PMPPASS
PLM18-00493 Plumbing Rough-in6/18/20186/18/20186/18/2018 2:36:35 PMPCANC
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER.
Hospital center and east dwv/h2O pressure test ok
PLM18-02073 Water and/or Sewer6/18/20186/18/20186/18/2018 2:19:16 PMPPART
water service/ Underground. If questions call Chad @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann.
2" poly ran from the east end of the utiility parking building and bored past the maintance buildings to the west. Call for final when the service is ran into the west end buildings.
PLM18-02232 Water and/or Sewer6/15/20186/18/20186/18/2018 1:37:10 PMAPART
Dusty Phone #: ###-####. 600 feet of 250lb polyethelyne pipe to canal. Pipe was routed under the canal by others and tied into a manhole. Gravity to the street connection.
50lb pressure test ok. Tracer wire installed. No cleanouts/blowout ports.