Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD18-01385 BLD-Conference6/16/20186/18/20186/18/2018 4:33:45 PMPPASS
Phone #: 2089892042 >> Inspection requested via mobile web by Dion Battles. Rebar ok.
BLD18-00979 BLD-Framing/Rough-in6/18/20186/18/20186/18/2018 3:47:33 PMPFAIL
Provide truss engineering. Fire block at top of all double walls. Need to provide continous 1hr. assembly were floor trusses sit on 1hr. wall. Will need to insulate behind tubs upstairs. Correction notice posted.
BLD18-00217 BLD-Final6/18/20186/18/20186/18/2018 3:02:05 PMPPASS
Matt Phone #: ###-####. OK for perm occ. No card on site to sign.
BLD18-00979 BLD-Framing/Rough-in6/18/20186/18/20186/18/2018 3:01:33 PMPCANC
Phone #: ###-#### Inspection requested via web by kevin debelloy.
BLD17-04467 BLD-Ceiling Grid Inspection6/18/20186/18/20186/18/2018 2:26:46 PMPPASS
Brain Phone #: ###-####
BLD17-03972 BLD-Framing/Rough-in6/15/20186/18/20186/18/2018 1:45:38 PMPPART
Micheal Phone #: ###-####. grid ok, pending fire sprinkler rough in and electrical at back room.
BLD18-01421 BLD-Final6/18/20186/18/20186/18/2018 1:24:47 PMPDONE
Pls contact Bryce (Foreman) @ ###-#### or George (Electrician) @ ###-#### one hr prior or if you have any questions. Thank you. Inspection requested via web by Rob Maes
BLD18-01421 DOC - Permit Finaled6/18/20186/18/20186/18/2018 1:24:38 PMPPASS
BLD17-02203 BLD-Final6/15/20186/18/20186/18/2018 10:52:07 AMANR
Brock Phone #: ###-####. . Needs zoning final.
BLD17-02201 BLD-Final6/15/20186/18/20186/18/2018 10:51:48 AMANR
Brock Phone #: ###-####. . Needs zoning final.
BLD17-02202 BLD-Final6/15/20186/18/20186/18/2018 10:51:28 AMANR
Brock Phone #: ###-####. . Needs zoning final.
BLD17-02124 BLD-Final6/15/20186/18/20186/18/2018 10:51:09 AMANR
Brock Phone #: ###-####. Needs zoning final.
BLD18-02003 BLD-Footing6/15/20186/18/20186/18/2018 9:59:53 AMAPASS
Robert Phone #: ###-####. set backs ok.
BLD18-01709 BLD-Footing6/15/20186/18/20186/18/2018 9:41:26 AMAPART
Dave Phone #: ###-####. Exterior perimeter footings 8x16. Interior footings for floor only 12x8. ok to place concrete. Noted that existing footing was not suitable for construction. Existing home has been demolished. Contractor will need to modify scope of work and plans to reflect new construction.
BLD18-01625 BLD-Framing/Rough-in6/15/20186/18/20186/18/2018 9:04:21 AMAPASS
Denny Phone #: ###-####. framing around new rear slider ok. Also noted additional fireplace and framing in back that will require a seperate mech. and bldg. permit.