FIR19-00793
| INSP-Sprinkler Rough-in | 6/18/2020 | 6/18/2020 | 6/18/2020 3:52:07 PM | P | PASS |
|
|
Rough-in passed. Insulation for breezeway piping installed. All piping is ok for cover. Still need the head added to the 4th floor roof access room as discussed. Mike Phone #: ###-####
|
BLD19-04918
| FIRE-Final Inspection | 6/18/2020 | 6/18/2020 | 6/18/2020 2:57:21 PM | P | PASS |
|
|
Life safety passed. Card signed. No sprinklers or alarms.
dave *screened* Phone #: ###-####
|
FIR19-00796
| INSP-Final Inspection | 6/16/2020 | 6/18/2020 | 6/18/2020 2:52:37 PM | P | PASS |
|
|
Permit finaled.
Barry will meet you. Phone #: ###-#### Inspection requested via web by Michelle Cooper
|
FIR20-00383
| INSP-Sprinkler Rough-in/Hydro | 6/17/2020 | 6/18/2020 | 6/18/2020 10:37:57 AM | A | FAIL |
|
|
Plan mods are needed since 1" piping was installed not the approved 3/4", missing pendant in one room, pipe has been sprayed with foam. Inspection stopped.
Overhead rough/hydro/tenting, call James before heading out! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR19-00888
| INSP-Sprinkler Rough-in/Hydro | 6/17/2020 | 6/18/2020 | 6/18/2020 10:35:36 AM | A | PASS |
|
|
The overhead hydro for the five systems was witnessed with no pressure loss. Header, FDC and fire pump piping was not tested.
Jeff Chaney is the contact. Thanks so much! Phone #: ###-#### Inspection requested via web by Stan Beus
|