PLM00-02105
| Water and/or Sewer | 6/16/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | A | PASS |
|
|
###-#### after 10
|
PLM00-01672
| Water and/or Sewer | 6/16/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 06/16/2000 at 15:14:28. Contact: ###-####. sewer replaced to gain grade to stub 6/19/00 11:41:37 AM
|
PLM00-01672
| Groundwork | 6/16/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/16/2000 at 15:15:01. Contact: ###-####. piping incomplete no test 6/19/00 11:42:01 AM
|
PLM00-00640
| Other | 6/19/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | A | PASS |
|
|
Added by Inspector: 330 On 6/19/00 this is an addition to get this mechine goin
|
PLM00-00065
| Plumbing Rough-in | 6/19/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | A | PART |
|
|
Added by Inspector: 330 On 6/19/00 still needs vtr
|
PLM00-02114
| Water and/or Sewer | 6/19/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 330 On 6/19/00 sw final ok
|
PLM00-01719
| Plumbing Rough-in | 6/19/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | P | PART |
|
|
Kevin ###-#### provide valving for freight plus in their space t&p drain and pan drain to floor check with ele for additional requirements 6/19/00 2:48:33 PM
|
PLM00-01919
| Plumbing Rough-in | 6/19/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/19/2000 at 08:41:02. Contact: ###-####.
|
PLM99-03855
| Final | 6/19/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/19/2000 at 09:20:27. Contact: ###-####. 6/19/00 5:07:52 PM cap future waste outlets in kitchen 6/19/00 5:08:11 PM
|
PLM00-00640
| Final | 6/19/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 330 On 6/19/00 1:30 harry hall ###-#### ###-####
|
PLM00-02072
| Water and/or Sewer | 6/19/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | P | PASS |
|
|
Tuffy Excavation ###-#### test ok 6/19/00 3:30:23 PM
|