BLD00-00665
| BLD-Foundation | 6/16/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 338 On 6/16/00 inspected 6/16/2k p.m.
|
BLD00-00668
| BLD-Foundation | 6/16/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by Inspector: 338 On 6/16/00 inspected 6/16/2k
|
BLD00-00902
| BLD-Framing/Rough-in | 6/16/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 06/16/2000 at 15:47:58. Contact: ###-####. Area's at upper floor 6/21/00 11:22:24 AM
|
BLD00-01242
| BLD-Framing/Rough-in | 6/19/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | P | FAIL |
|
|
Scott ###-#### C/N on job need truss specs & re-nail trusses- ok to size & insulate. 6/21/00 11:16:25 AM
|
BLD00-00589
| BLD-Conference | 6/19/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | P | NR |
|
|
consultation Jim ###-#### Ceiling joist vs. insulation. 6/21/00 11:16:58 AM
|
BLD00-01589
| BLD-Framing/Rough-in | 6/19/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | P | PASS |
|
|
ken ###-#### Shear wall only w/Verbal correction. 6/21/00 11:15:45 AM
|
BLD00-01367
| BLD-Foundation | 6/19/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | P | FAIL |
|
|
###-#### Already poured 6/21/00 11:16:42 AM
|
BLD00-01534
| BLD-Footing | 6/19/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | P | FAIL |
|
|
Jack ###-#### Not ready 6/21/00 11:16:32 AM
|
BLD00-01644
| BLD-Footing | 6/15/2000 | 6/19/2000 | 6/19/2000 12:00:00 AM | P | PART |
|
|
###-#### ready at noon Work in progress- set back approved by P&Z. 6/21/00 11:15:59 AM
|