PLM01-00762
| PLM-Aging Inspection | 6/19/2001 | 6/19/2001 | 6/19/2001 12:00:00 AM | | PASS |
|
|
|
PLM01-02006
| Sprinkler (Final) | 6/18/2001 | 6/19/2001 | 6/19/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM01-01943
| Plumbing Rough-in | 6/19/2001 | 6/19/2001 | 6/19/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 07:35:40. Contact: ###-####.
|
PLM01-01949
| Plumbing Rough-in | 6/19/2001 | 6/19/2001 | 6/19/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 07:36:17. Contact: ###-####.
|
PLM01-01445
| Sprinkler (Final) | 6/19/2001 | 6/19/2001 | 6/19/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/19/2001 at 08:10:37. Contact: ###-####.
|
PLM01-00419
| Final | 6/19/2001 | 6/19/2001 | 6/19/2001 12:00:00 AM | P | PART |
|
|
###-####temp occ set two sinks washer box trim caulk emp shower faucet install service valve and union on vacum backflow reposition rp from on top of vacum pump 6/19/2001 12:36:37 PM
|
PLM01-01980
| Water and/or Sewer | 6/19/2001 | 6/19/2001 | 6/19/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 309 On 6/19/2001 10:13:09 AM
|