Inspections for the day of: Tuesday, June 19, 2001.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM01-01995 Sprinkler (Final)6/18/20016/19/20016/19/2001 12:00:00 AMAPASS
morgan ###-####
PLM01-02008 Plumbing Rough-in6/18/20016/19/20016/19/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 06/18/2001 at 15:29:54. Contact: ###-####.need to change san tee on it's back to combo for approved drainage for master bath laves hall bath toilet upstairs to close to tub side wall 6/19/2001 11:32:16 AM
PLM00-03942 Final6/18/20016/19/20016/19/2001 12:00:00 AMPPART
dan ###-#### particle rough-in and final had conference with home owner on correction's will recall when ready 6/19/2001 2:44:27 PM
PLM01-01036 Plumbing Rough-in6/18/20016/19/20016/19/2001 12:00:00 AMPPART
top off for drains and water joel ###-#### late pm pipe t/p to out side pipe water heater pan's to out side support vent's in attic need insulator's by kit and tub area 6/19/2001 5:18:57 PM
PLM01-01035 Plumbing Rough-in6/18/20016/19/20016/19/2001 12:00:00 AMPPART
top off for drains and water joel ###-#### late pm finish t/p and pan drain lines need insolator's by kit and bath area on pex piping 6/19/2001 5:24:35 PM
PLM01-01037 Plumbing Rough-in6/18/20016/19/20016/19/2001 12:00:00 AMPPART
top off for drain and water ###-#### late pm finish t/p and pan drain piping need insolators on pex piping by kit and bath area 6/19/2001 5:26:19 PM