PLM01-01995
| Sprinkler (Final) | 6/18/2001 | 6/19/2001 | 6/19/2001 12:00:00 AM | A | PASS |
|
|
morgan ###-####
|
PLM01-02008
| Plumbing Rough-in | 6/18/2001 | 6/19/2001 | 6/19/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/18/2001 at 15:29:54. Contact: ###-####.need to change san tee on it's back to combo for approved drainage for master bath laves hall bath toilet upstairs to close to tub side wall 6/19/2001 11:32:16 AM
|
PLM00-03942
| Final | 6/18/2001 | 6/19/2001 | 6/19/2001 12:00:00 AM | P | PART |
|
|
dan ###-#### particle rough-in and final had conference with home owner on correction's will recall when ready 6/19/2001 2:44:27 PM
|
PLM01-01036
| Plumbing Rough-in | 6/18/2001 | 6/19/2001 | 6/19/2001 12:00:00 AM | P | PART |
|
|
top off for drains and water joel ###-#### late pm pipe t/p to out side pipe water heater pan's to out side support vent's in attic need insulator's by kit and tub area 6/19/2001 5:18:57 PM
|
PLM01-01035
| Plumbing Rough-in | 6/18/2001 | 6/19/2001 | 6/19/2001 12:00:00 AM | P | PART |
|
|
top off for drains and water joel ###-#### late pm finish t/p and pan drain lines need insolator's by kit and bath area on pex piping 6/19/2001 5:24:35 PM
|
PLM01-01037
| Plumbing Rough-in | 6/18/2001 | 6/19/2001 | 6/19/2001 12:00:00 AM | P | PART |
|
|
top off for drain and water ###-#### late pm finish t/p and pan drain piping need insolators on pex piping by kit and bath area 6/19/2001 5:26:19 PM
|