PLM02-01807
| Groundwork | 6/19/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | P | CANC |
|
|
andy ###-####
|
PLM02-01802
| Plumbing Rough-in | 6/19/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | P | PART |
|
|
underground r/i- ###-#### not ready and notified plumber that we wanted to see sewage ejector extention 6/19/2002 3:59:06 PM
|
PLM02-01775
| Plumbing Rough-in | 6/19/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | P | PART |
|
|
sharon -###-#### r/i two overdrains 6/19/2002 3:34:30 PM
|
PLM02-00812
| Plumbing Rough-in | 6/19/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 06/19/2002 at 10:43:28. Contact: ###-####.test not on yet, nor did I look at bottom, Plumber said he would have Terry call it back in for tomarrow. 6/19/2002 2:32:20 PM
|
PLM02-00151
| Water and/or Sewer | 6/19/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | P | FAIL |
|
|
###-#### told them to re-check grade 6/19/2002 2:54:58 PM
|
PLM02-01814
| Sprinkler (Final) | 6/19/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | P | PASS |
|
|
RICK ###-####--
|
PLM02-00151
| Water and/or Sewer | 6/19/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 309 On 6/19/2002 2:54:19 PM went back and helped them regrade pipe, after they found their level. ok now. 6/19/2002 2:56:49 PM
|