PLM02-00923
| Final | 6/18/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/18/2002 at 13:27:03. Contact: ###-####.
|
PLM02-01761
| Sprinkler (Final) | 6/18/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | A | PASS |
|
|
###-####
|
PLM02-01793
| Sprinkler (Final) | 6/18/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | A | PASS |
|
|
###-#### MICKI
|
PLM02-01805
| Water and/or Sewer | 6/19/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | P | PASS |
|
|
###-#### larry
|
PLM02-00499
| Other | 6/19/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 6/19/2002 2:48:02 PM conference on hot water recirc. line to upstream of rp ok
|
PLM02-00343
| Plumbing Rough-in | 6/19/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | P | PART |
|
|
Added by Inspector: 330 On 6/19/2002 4:17:20 PM concentrated metals and high temp iw test ok
|