ELE02-01054
| Final | 6/18/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | A | NH |
|
|
Scheduled by a contractor via Hello! on 06/18/2002 at 20:36:08. Contact: ###-####. no access 6/19/2002 9:10:37 AM
|
ELE02-01606
| Electrical Rough-In | 6/18/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | A | PART |
|
|
###-#### KELLY 1ST FLOOR EAST SIDE ok cover ceiling 1st section 6/19/2002 8:50:03 AM
|
ELE02-01795
| Electrical Rough-In | 6/19/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/19/2002 at 07:41:03. Contact: ###-####. COW corrections NEC800.5, 800.6, 314.23(2)(D), 358.30(A), 330.30, 330.40, 314.16, 314.25, 312.5(A), 348.30, & 312.5(C) 6/19/2002 4:04:25 PM
|
ELE02-00381
| Electrical Rough-In | 6/19/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | P | PART |
|
|
###-#### doug ok cover ceiling tower #1 6/19/2002 12:36:49 PM
|
ELE02-01054
| Final | 6/19/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | P | PASS |
|
|
ok final 6/19/2002 3:07:02 PM
|
ELE02-00517
| Electrical Rough-In | 6/19/2002 | 6/19/2002 | 6/19/2002 12:00:00 AM | P | PASS |
|
|
per mike r/i & conf ok conf. 6/19/2002 3:59:08 PM
|
ELE02-01054
| Final | 6/18/2002 | 6/19/2002 | 6/18/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 06/18/2002 at 20:20:24. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 06/18/2002 at 20:34:50.
|