BLD03-00175
| FIRE-Final Inspection | 6/18/2003 | 6/19/2003 | 6/19/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 6/18/2003 at 7:54:05 AM. Contact: ###-####. phase A of this project okay pending structural okay 6/19/2003 10:28:31 AM
|
BLD03-00796
| FIRE-Final Inspection | 6/18/2003 | 6/19/2003 | 6/19/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/18/2003 at 7:55:43 AM. Contact: ###-####.
|
BLD00-02925
| BLD-Conference | 6/18/2003 | 6/19/2003 | 6/19/2003 12:00:00 AM | A | PART |
|
|
Rick; this is on my aging list...can we final this? Carl ###-#### Went to the Hof and left message with desk clerk (Wendy is on vacation until 6/23) and left message for Wendy to call me about this permit 6/19/2003 2:27:42 PM
|
FIR03-00077
| INSP-Final Inspection | 6/18/2003 | 6/19/2003 | 6/19/2003 12:00:00 AM | A | CANC |
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Barbara Moore per telecon with Ken this is rescheduled for 6/23 at 8 am 6/19/2003 2:28:41 PM
|
FIR03-00076
| INSP-Final Inspection | 6/19/2003 | 6/19/2003 | 6/19/2003 12:00:00 AM | A | PART |
|
|
phase A okay
|
FIR03-00144
| INSP-Sprinkler Rough-in | 6/19/2003 | 6/19/2003 | 6/19/2003 12:00:00 AM | A | PART |
|
|
phase A okay
|
BLD03-00767
| BLD-Final | 6/19/2003 | 6/19/2003 | 6/19/2003 12:00:00 AM | P | CANC |
|
|
see fire final 6/19/2003 2:08:04 PM
|
BLD03-00767
| FIRE-Final Inspection | 6/19/2003 | 6/19/2003 | 6/19/2003 12:00:00 AM | P | PASS |
|
|
|
BLD03-00435
| FIRE-Final Inspection | 6/19/2003 | 6/19/2003 | 6/19/2003 12:00:00 AM | P | PART |
|
|
Phase 1 okay to occupy
|
FIR03-00249
| INSP-Alarm Testing | 6/18/2003 | 6/19/2003 | 6/19/2003 12:00:00 AM | P | PART |
|
|
We would like the inspection for tomorrow at 3pm if possible. If not please let me know.
Thanks Rick; Phone #: ###-#### Internet Inspection Request from: Rick Groom Phase 1 okay; will test circuits when the entire floor is completed 6/19/2003 3:57:39 PM
|