PLM06-01102
| PLM-Aging Inspection | 6/19/2006 | 6/19/2006 | 6/20/2006 12:23:45 PM | | PASS |
|
|
project still under construction
|
PLM05-01763
| PLM-Aging Inspection | 6/19/2006 | 6/19/2006 | 6/20/2006 12:21:43 PM | | PASS |
|
|
project still under construction still need to test south -east corner drain
|
PLM06-02073
| Plumbing Rough-in | 6/19/2006 | 6/19/2006 | 6/19/2006 4:40:32 PM | P | PART |
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt need to raise island type vent for laves in master bath not less than 6 inches above flood level of laves need to move two inch vent 10 feet away or 3 feet above opening window up staires called contractor will recall when ready
|
PLM06-00748
| Final | 6/17/2006 | 6/19/2006 | 6/19/2006 4:36:15 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/17/2006 at 4:03:28 PM. Contact: ###-####.
|
PLM06-00702
| Final | 6/17/2006 | 6/19/2006 | 6/19/2006 3:33:57 PM | P | NR |
|
|
Scheduled by a contractor via Hello! on 6/17/2006 at 4:06:34 PM. Contact: ###-####. not ready
|
PLM06-00288
| Final | 6/19/2006 | 6/19/2006 | 6/19/2006 3:18:29 PM | P | FAIL |
|
|
BILL; Phone #: ###-#### Internet Inspection Request from: Darla Downs anchor dish washer drain to bottom of kitchen counter caulk sink in garage to wall anchor hose bibb in back of home knock out correct opening in washer box for drain and provide trim plate for washer box left correction notice on job site
|
PLM06-01668
| Plumbing Rough-in | 6/19/2006 | 6/19/2006 | 6/19/2006 2:23:58 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 6/19/2006 at 7:38:13 AM. Contact: ###-####.
|
PLM05-03314
| Roof Drains | 6/19/2006 | 6/19/2006 | 6/19/2006 2:20:20 PM | P | PASS |
|
|
Rain drains and vents through roof on penthouse. If questions call Donny, ###-####; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
PLM06-02053
| Groundwork | 6/19/2006 | 6/19/2006 | 6/19/2006 1:39:44 PM | P | PASS |
|
|
|
PLM06-02053
| Plumbing Rough-in | 6/19/2006 | 6/19/2006 | 6/19/2006 1:39:30 PM | P | NR |
|
|
troy; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
PLM06-02050
| Groundwork | 6/16/2006 | 6/19/2006 | 6/19/2006 1:37:24 PM | A | PART |
|
|
John; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt san. sewer and grease trunk lines test ok
|
PLM06-02028
| Final | 6/15/2006 | 6/19/2006 | 6/19/2006 10:16:05 AM | A | PASS |
|
|
Rick, please call 1st for Teresa @ ###-####; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
PLM06-00502
| PLM-Aging Inspection | 6/19/2006 | 6/19/2006 | 6/19/2006 8:40:30 AM | | PASS |
|
|
|
PLM06-00502
| DOC - Permit Finaled | 6/19/2006 | 6/19/2006 | 6/19/2006 8:40:20 AM | A | PASS |
|
|
|
PLM06-00585
| Final | 6/16/2006 | 6/19/2006 | 6/19/2006 8:28:51 AM | A | PASS |
|
|
|