Inspections for the day of: Monday, June 19, 2006.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00321 INSP-Sprinkler Rough-in/Hydro6/19/20066/19/20066/20/2006 7:54:56 AMPPART
UG supply line is acceptable for cover.
FIR06-00128 INSP-Supply line flush6/16/20066/19/20066/20/2006 7:53:51 AMPPART
UG supply line flush performed satisfactory.
BLD05-02930 FIRE-Final Inspection6/16/20066/19/20066/20/2006 7:52:52 AMAFAIL
Provide approved hardware at the west facing exit door, provide building address numbers for both sides of the building as it is corner facing, need to supply means to test the duct smoke detector.
FIR06-00396 INSP-Sprinkler Rough-in6/16/20066/19/20066/19/2006 10:30:06 AMAPART
Heads in the elevator lobby vaulted hard lid ceiling area are okay to cover.
FIR06-00128 INSP-Sprinkler Rough-in/Hydro6/16/20066/19/20066/19/2006 10:02:14 AMAPART
This inspection was performed on friday afternoon 6/16. Overhead rough-in is acceptable to cover at the drop ceiling areas on the 1st floor. Items needing addressed include one overspaced head in the linen room, one painted head in a restroom, one head blocked by a surface mounted light in the janitors closet, need to provide plans reflecting actual field installation at the lobby area where the drop ceilings were deleted in lieu of OTS. The resubmitted plans are still only issued in a PARTIAL status due to hydraulic calculations per note #3-revise and resubmit for final approval.
FIR05-00713 INSP-Sprinkler Rough-in6/16/20066/19/20066/19/2006 9:53:33 AMAPART
UG supply line and riser are okay to cover, need to provide means for seismic clearance where ductile will pass through the floor slab.