FIR06-00321
| INSP-Sprinkler Rough-in/Hydro | 6/19/2006 | 6/19/2006 | 6/20/2006 7:54:56 AM | P | PART |
|
|
UG supply line is acceptable for cover.
|
FIR06-00128
| INSP-Supply line flush | 6/16/2006 | 6/19/2006 | 6/20/2006 7:53:51 AM | P | PART |
|
|
UG supply line flush performed satisfactory.
|
BLD05-02930
| FIRE-Final Inspection | 6/16/2006 | 6/19/2006 | 6/20/2006 7:52:52 AM | A | FAIL |
|
|
Provide approved hardware at the west facing exit door, provide building address numbers for both sides of the building as it is corner facing, need to supply means to test the duct smoke detector.
|
FIR06-00396
| INSP-Sprinkler Rough-in | 6/16/2006 | 6/19/2006 | 6/19/2006 10:30:06 AM | A | PART |
|
|
Heads in the elevator lobby vaulted hard lid ceiling area are okay to cover.
|
FIR06-00128
| INSP-Sprinkler Rough-in/Hydro | 6/16/2006 | 6/19/2006 | 6/19/2006 10:02:14 AM | A | PART |
|
|
This inspection was performed on friday afternoon 6/16. Overhead rough-in is acceptable to cover at the drop ceiling areas on the 1st floor. Items needing addressed include one overspaced head in the linen room, one painted head in a restroom, one head blocked by a surface mounted light in the janitors closet, need to provide plans reflecting actual field installation at the lobby area where the drop ceilings were deleted in lieu of OTS. The resubmitted plans are still only issued in a PARTIAL status due to hydraulic calculations per note #3-revise and resubmit for final approval.
|
FIR05-00713
| INSP-Sprinkler Rough-in | 6/16/2006 | 6/19/2006 | 6/19/2006 9:53:33 AM | A | PART |
|
|
UG supply line and riser are okay to cover, need to provide means for seismic clearance where ductile will pass through the floor slab.
|