Inspections for the day of: Monday, June 19, 2006.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-00007 BLD-Footing6/19/20066/19/20066/20/2006 7:55:50 AMPDEFR
###-#### rebar inspection. light pole base, non structural item.
MIS06-00106 BLD-Final6/16/20066/19/20066/19/2006 4:22:54 PMPPASS
Stephanie; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt Hand rail issues have been resolved. ok for perm occ.
BLD06-01174 BLD-Framing/Rough-in6/19/20066/19/20066/19/2006 3:56:22 PMPPART
mark; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley.contractor to supply connection detail for 2.5 inch steel studs to exterior face of split face CMU wall.
BLD06-00904 BLD-Final6/16/20066/19/20066/19/2006 3:28:03 PMPPASS
Scheduled by a contractor via Hello! on 6/16/2006 at 9:37:13 AM. ok for perm occ.
BLD06-01524 BLD-Final6/19/20066/19/20066/19/2006 3:14:48 PMPPASS
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Buc. Ok for perm occ.
BLD06-00386 BLD-Final6/19/20066/19/20066/19/2006 2:50:21 PMPPASS
loren; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
BLD06-00386 DOC - Permit Finaled6/19/20066/19/20066/19/2006 2:50:11 PMPPASS
Landing has been repaired.
BLD06-00984 BLD-Framing/Rough-in6/16/20066/19/20066/19/2006 2:43:35 PMPPART
ryan ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Needs to mprovide engineering on floor joist. Add straps to added beams in basement.
BLD05-02227 BLD-Framing/Rough-in6/19/20066/19/20066/19/2006 2:18:43 PMPNR
Brian; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD05-02231 BLD-Framing/Rough-in6/19/20066/19/20066/19/2006 2:18:28 PMPNR
Brian; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD05-02230 BLD-Framing/Rough-in6/19/20066/19/20066/19/2006 2:12:26 PMPCANC
Brian; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD05-02230 BLD-Energy code compliance6/19/20066/19/20066/19/2006 2:12:12 PMPPASS
Brian; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD03-02995 BLD-Aging Inspection6/19/20066/19/20066/19/2006 12:47:40 PM DONE
BLD03-02995 DOC - Permit Finaled6/19/20066/19/20066/19/2006 12:47:26 PMPPASS
life/safety has finaled. ok.
BLD03-02723 BLD-Aging Inspection6/19/20066/19/20066/19/2006 12:46:43 PM DONE
BLD03-02723 DOC - Permit Finaled6/19/20066/19/20066/19/2006 12:46:32 PMPPASS
BLD05-03275 BLD-Final6/16/20066/19/20066/19/2006 11:16:39 AMAPASS
for a sign -roger - ###-####
BLD05-03275 DOC - Permit Finaled6/19/20066/19/20066/19/2006 11:16:29 AMPPASS
BLD05-03024 BLD-Framing/Rough-in6/16/20066/19/20066/19/2006 10:32:06 AMAPART
carl; Phone #: ###-#### Internet Inspection Request from: Cathy Chil. Needs to install fireblocking at ceiling line. ok to insulate.
BLD06-00895 BLD-Framing/Rough-in6/16/20066/19/20066/19/2006 9:46:56 AMADEFR
Scheduled by a contractor via Hello! on 6/15/2006 at 4:26:27 PM. Contact: ###-####. State of Idaho has inspected the 2hr. wall seperating the new unit from the old unit. State will also be inspecting 1hr corridors. Modular units are already assembeled when on site. noted to contractor that copies of inspections and tags will be required at bldg. final. Did note that 2hr wall is not yet extended the min 18" horizintally or the 30" inches vertically as noted on permit and approved plans. Could not verify if 2hr. wall extetnds to footing.
BLD06-01291 BLD-Final6/16/20066/19/20066/19/2006 9:07:08 AMAFAIL
Scheduled by a contractor via Hello! on 6/16/2006 at 1:31:23 PM. Contact: ###-####. Needs to provide engineering for structural attachment to existing bldg.
BLD03-02836 BLD-Aging Inspection6/19/20066/19/20066/19/2006 8:22:13 AM CANC
BLD03-02836 DOC - Permit Finaled6/19/20066/19/20066/19/2006 8:22:04 AMPPASS