PLM07-00058
| Final | 6/19/2007 | 6/19/2007 | 6/19/2007 4:33:14 PM | P | NH |
|
|
bob; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|
PLM07-01562
| Groundwork | 6/19/2007 | 6/19/2007 | 6/19/2007 4:20:01 PM | P | PART |
|
|
Colin Libby is the field contact. Partial ground inspection. Phone #: ###-#### Internet Inspection Request from: Heidi Mallet-sanitary & grease waste ground work complete(pass)still need water line & roof drain tie in's.
|
PLM07-02082
| Water and/or Sewer | 6/19/2007 | 6/19/2007 | 6/19/2007 4:00:01 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Scott Wickstrom-need permit for sprinkler backflow-waterline pass.
|
PLM07-01958
| Sprinkler (Final) | 6/19/2007 | 6/19/2007 | 6/19/2007 3:40:20 PM | P | FAIL |
|
|
brad Phone #: ###-####-stop & waste valve is not approved for shut off & drain down valve for lawn sprinklers-pvb needs tested & certified.
|
PLM07-01959
| Sprinkler (Final) | 6/19/2007 | 6/19/2007 | 6/19/2007 2:52:15 PM | P | PASS |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|
PLM07-00872
| Plumbing Rough-in | 6/19/2007 | 6/19/2007 | 6/19/2007 2:38:04 PM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 6/19/2007 at 8:21:00 AM. Contact: ###-####.-need to fix backgrade on washer & double lav where drain comes out of slab-dwv test failed-water test failed-missing nailplates.
|
PLM07-01874
| Other | 6/19/2007 | 6/19/2007 | 6/19/2007 1:43:17 PM | P | DONE |
|
|
john - conference ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith-this was a conferance on plumbing a toilet & lav.
|
PLM07-02090
| Final | 6/18/2007 | 6/19/2007 | 6/19/2007 11:53:30 AM | A | PART |
|
|
Contact is Dusty @ ###-####. Requesting early morning inspection if possible. Phone #: ###-#### Internet Inspection Request from: Dave Mogel-rough-in pass.
|
PLM07-02084
| Sprinkler (Final) | 6/18/2007 | 6/19/2007 | 6/19/2007 11:32:29 AM | A | PASS |
|
|
Dennis ; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
PLM07-01281
| Final | 6/18/2007 | 6/19/2007 | 6/19/2007 11:16:48 AM | A | PASS |
|
|
JOB # 10624 Phone #: ###-#### Internet Inspection Request from: Ann Marie Reyes
|
PLM07-02081
| Plumbing Rough-in | 6/18/2007 | 6/19/2007 | 6/19/2007 11:04:23 AM | A | FAIL |
|
|
paul ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith-need 2" c/o on drain for k/s-cannot have pvc glued to abs in side building.
|
PLM07-02091
| Groundwork | 6/18/2007 | 6/19/2007 | 6/19/2007 10:28:41 AM | A | PEND |
|
|
tom; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang-need to find out why plumbing on review notes say no plumbing.
|
PLM07-01349
| Other | 6/18/2007 | 6/19/2007 | 6/19/2007 9:51:17 AM | A | CANC |
|
|
CONFERENCE INSPECTION WITH MIKE WEBB Phone #: ###-#### Internet Inspection Request from: ADAM WARR
|
PLM07-01769
| Plumbing Rough-in | 6/18/2007 | 6/19/2007 | 6/19/2007 9:50:55 AM | A | PASS |
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|
PLM05-04309
| Med/Gas Systems | 6/18/2007 | 6/19/2007 | 6/19/2007 9:23:10 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 6/18/2007 at 4:09:10 PM. Contact: ###-####.start 24 hr test on 4" vacuum line in boiler room north tower.
|
PLM05-04309
| Plumbing Rough-in | 6/18/2007 | 6/19/2007 | 6/19/2007 9:20:34 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 6/18/2007 at 4:07:56 PM. Contact: ###-####.9th flr water in walls in rooms 97315,11,10,09,08,05,06 pass.
|