Inspections for the day of: Thursday, June 19, 2008.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-00012 Site Preparation6/19/20086/19/20086/19/2008 3:19:04 PMPPASS
All work has been completed.
CAS
#460
ESC07-01264 General Inspection6/19/20086/19/20086/19/2008 1:39:31 PMPPART
Stock pile is going to be used for fill in the phase 10 patrail of the developement. Will be starting soon on the fill part. Told Rp that protection at the bottom of slope will be need, weather permitting.
CAS
#460
ESC07-01280 General Inspection6/19/20086/19/20086/19/2008 1:37:53 PMPFAIL
need to clean up all sediment out of the paved street. Clean up the d.i. also.
CAS
#460
ESC06-00024 Site Final6/19/20086/19/20086/19/2008 10:05:48 AMAPASS
All work is complete.
CAS
#460
ESC06-00030 Site Final6/19/20086/19/20086/19/2008 10:03:15 AMPPASS
All work is completed.
CAS
#460
ESC06-00030 Aging Inspection6/19/20086/19/20086/19/2008 10:02:00 AM DEFR
moved to a site final.
ESC06-00028 Site Final6/19/20086/19/20086/19/2008 10:00:22 AMAPASS
All work is completed on this lot.
CAS
#460
ESC06-00028 Aging Inspection6/19/20086/19/20086/19/2008 9:59:11 AM DEFR
Moved to a site final.
ESC06-00026 Aging Inspection6/19/20086/19/20086/19/2008 9:57:19 AM DEFR
Moved to a site final.
ESC06-00026 Site Final6/19/20086/19/20086/19/2008 9:57:09 AMPPASS
All work has been completed.
CAS
#460
ESC06-00029 Aging Inspection6/19/20086/19/20086/19/2008 9:54:17 AM DEFR
moved to a site final.
ESC06-00029 Site Final6/19/20086/19/20086/19/2008 9:53:38 AMPPASS
All work is complete.
CAS
#460
ESC07-00070 General Inspection6/19/20086/19/20086/19/2008 9:24:11 AMAFAIL
Gradin has not occured on site yet. So the spoil piles of concrete and asphalt still exsist.
Will re-inspect a week from now.
CAS
#460
ESC08-00230 Random Inspection6/19/20086/19/20086/19/2008 9:12:09 AMPPASS
At this time they are finished with dewatering. All in all, site looks good.
CAS
#460
ESC08-00323 Site Final6/19/20086/19/20086/19/2008 9:10:00 AMAFAIL
Site is not fully stabilized. When they have completed the path back to the lake a informed them to call for a site final then.
CAS
#460
ESC08-00415 Complaint Inspection6/19/20086/19/20086/19/2008 12:00:00 AMAFAIL
Concrete washed out in street from pool construction. Talked to pool company, owner and foreman. Walt from pretreatment issued a "notice to clean". Directed pool company to complete cleanup and to complete the RP certification class. Citations will not be issued on this case but further violations will result in issuance of citations.