Inspections for the day of: Wednesday, June 19, 2013.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorKimberly M. Johnson
TitleEROSION CONTROL
Phone #208-794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00475 BMP Violation6/14/20136/19/20136/20/2013 12:00:00 AMAPASS
ESC13-00486 BMP Violation6/14/20136/19/20136/20/2013 12:00:00 AMAFAIL
ESC sign is up but no ESC BMPs have been installed. LM for RP. Dave Evans Construction changed RP to Zane. BMPs are scheduled to be installed Friday 6/21
ESC13-00344 Complaint Inspection6/19/20136/19/20136/20/2013 12:00:00 AMPFAIL
Significant tracking was present at both exits. Discussed with Eric need to extend stabilized access to 50'. Contractors need to scrape mud off road with flat nose shovel or street sweeper. Inspection conducted immediately following heavy rain; tracking and fines from drain rock covered road and drained to culvert inlet
ESC13-00514 Site Preparation6/19/20136/19/20136/19/2013 12:00:00 AMPFAIL
Sediment controls and construction access need installed. Dirt haul out expected to be completed 6/20.