FIR13-00167
| INSP-Sprinkler Rough-in/Hydro | 6/19/2015 | 6/19/2015 | 6/19/2015 2:30:07 PM | P | PEND |
|
|
Recieved pump report from fire pump rep., stating the results from pump test on 6/17. Report indicated that 150% test could not be performed. I informed Jeff (Shilo) that we would require the pump rep. conduct the next test to ensure that the pump is operating correctly, and that flows at the 150% of pump capacity can be obtained.
|
FIR15-00096
| INSP-Sprinkler Rough-in | 6/19/2015 | 6/19/2015 | 6/19/2015 2:22:26 PM | P | PART |
|
|
Reinspection of 5th floor South dry pipe system for attic protection, including changes made to address numerous obstructions created by the installation of draft stops. All previous discrepancies corrected this visit, except for units 517, and 518, which will require further work. OK to cover all units except units 517 and 518, which will require reinspection prior to cover.
|
FIR14-00365
| INSP-Sprinkler Rough-in/Hydro | 6/19/2015 | 6/19/2015 | 6/19/2015 1:22:34 PM | P | PASS |
|
|
24 hour air test of dry pipe valves for six (6) systems, including 2nd floor Helix, 3rd floor Helix, 3rd floor parking garage, 4th floor Helix, 4th floor parking garage, and 5th floor Helix - all system air tests held pressure. PASSED
|
FIR15-00096
| INSP-Sprinkler Rough-in | 6/18/2015 | 6/19/2015 | 6/19/2015 11:32:47 AM | A | PART |
|
|
Retest of 5th fllor south dry pipe system to check for corrections needed from 6/18 inspection - many discrepancies were not adequately addressed, so plans to come back for another inspection are necessary. Completed the 5th floor south wet system inspection, that were not ready on the 6/18 inspection. - OK to cover this area. Also inspected 4th floor east side drop lids, including units 401, 402, 403, 404, 405, 406, 407, 409, 410, 411, 412, 413, 414, 415, 416, 417, 418, 420 and 443. All inspected OK - OK to cover the hard lids in these units.
|