ELE19-02074
| Temporary Service | 6/19/2019 | 6/19/2019 | 6/19/2019 2:49:42 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Alan Lusk t/s u/g n ok
|
ELE19-02134
| Electrical Rough-In | 6/19/2019 | 6/19/2019 | 6/19/2019 1:29:04 PM | P | FAIL |
|
|
Our guys should be out on site. Please give Micah a call at ###-#### if you have any questions. Thanks! Phone #: ###-#### Inspection requested via web by Jesse Simpson No panels onsite Re-call when panels are onsite and before intalled
|
ELE19-02237
| Electrical Rough-In | 6/18/2019 | 6/19/2019 | 6/19/2019 1:09:10 PM | P | PASS |
|
|
For access please call Josh 1/2 hr prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott 2nd floor, Master bed, Bath and closet. Hall bath ok to cover. P/F boxes added in the other beds and smokes through out. (No walls were opened in the back bedrooms.)
|
ELE19-01924
| Final | 6/17/2019 | 6/19/2019 | 6/19/2019 11:40:41 AM | A | PASS |
|
|
Rick Phone #: ###-#### Final ok
|
ELE17-02195
| ELE-Aging Inspection | 6/19/2019 | 6/19/2019 | 6/19/2019 10:20:08 AM | | DONE |
|
|
No final scheduled at this time
|
ELE16-03066
| ELE-Aging Inspection | 6/19/2019 | 6/19/2019 | 6/19/2019 10:18:36 AM | | FAIL |
|
|
Corrections have not been made. No attempt to final at this time
|
ELE19-02231
| Conference | 6/17/2019 | 6/19/2019 | 6/19/2019 10:17:06 AM | A | PASS |
|
|
Rich Phone #: ###-#### Customer adding Master bed, bath and closet as well as 1 bed and a laundry room. Discussed 20A for laundry, 20A for Bath vanity, 30A for dryer, AFCI for beds, Tamper resistant receps for all locations. Adding Furnace in crawl. Will require Light and recep, both will need GFCI protection.
|
ELE19-02203
| Final | 6/19/2019 | 6/19/2019 | 6/19/2019 10:13:27 AM | A | PASS |
|
|
Re-inspection for final after plumbing work completed. Contact Alex Ybarra Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Final ok
|
ELE19-02131
| Final | 6/17/2019 | 6/19/2019 | 6/19/2019 10:10:25 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Rob Maes Final ok
|
ELE19-02257
| Electrical Rough-In | 6/18/2019 | 6/19/2019 | 6/19/2019 9:15:06 AM | A | PASS |
|
|
Back porch ceiling cover Phone #: ###-#### Inspection requested via web by Kory Peterson Covered patio only ok to cover
|
ELE19-02179
| Electrical Rough-In | 6/18/2019 | 6/19/2019 | 6/19/2019 9:06:52 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Bryan Atkins Back dining area only ok to cover
|