ELE00-01642
| Final | 6/1/2000 | 6/2/2000 | 6/2/2000 12:00:00 AM | A | PART |
|
|
###-#### John Not completed; needs above ceiling inspection, (tiles installed) called contractor. Temp. occ. 6/5/00 10:51:08 AM
|
ELE00-02057
| Electrical Rough-In | 6/1/2000 | 6/2/2000 | 6/2/2000 12:00:00 AM | A | PASS |
|
|
Paul ###-#### ele. R/I; kitchen; bathroom 6/5/00 10:48:59 AM
|
ELE00-00796
| Final | 6/2/2000 | 6/2/2000 | 6/2/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 06/02/2000 at 05:54:17. Contact: ###-####. Sub-panel for pool. 6/5/00 10:49:18 AM
|
ELE00-00638
| Final | 6/2/2000 | 6/2/2000 | 6/2/2000 12:00:00 AM | P | FAIL |
|
|
john ###-#### Not completed; contractor will reschedule 6/5/00 10:56:54 AM
|
ELE00-02062
| Permanent Service | 6/2/2000 | 6/2/2000 | 6/2/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 06/02/2000 at 09:57:06. Contact: ###-####. Street lights 2000; UGN perm./svc 6/5/00 10:57:10 AM
|
ELE00-00803
| Final | 6/2/2000 | 6/2/2000 | 6/2/2000 12:00:00 AM | P | PASS |
|
|
Bill Ramsey ###-#### Completed 6/5/00 10:38:11 AM
|
ELE00-01138
| Final | 6/2/2000 | 6/2/2000 | 6/2/2000 12:00:00 AM | P | PASS |
|
|
5th floor Sean ###-#### Final ok 6/5/00 10:38:03 AM
|
ELE00-02067
| Electrical Rough-In | 6/2/2000 | 6/2/2000 | 6/2/2000 12:00:00 AM | P | PASS |
|
|
###-#### one room 1-room addition; ele. R/I 6/5/00 10:56:40 AM
|