ESC04-00126
| Site Preparation | 5/27/2004 | 6/2/2004 | 6/2/2004 12:00:00 AM | A | NR |
|
|
Construction activities have not started. Will follow up. 6/2/2004 3:01:17 PM
|
ESC04-00293
| Site Preparation | 5/27/2004 | 6/2/2004 | 6/2/2004 12:00:00 AM | A | PART |
|
|
Ok to wait until backfill activities have been done to install silt fence. 6/2/2004 2:15:08 PM
|
ESC04-00394
| BMP Violation | 6/2/2004 | 6/2/2004 | 6/2/2004 12:00:00 AM | P | PART |
|
|
Correction to rp--Delivery truck caused excessive trackout onto hard surface. Was no need for truck to drive all the way to opposite side of lot on bare soil. Clean up and sweep daily or as needed. 6/2/2004 3:31:35 PM
|