Inspections for the day of: Thursday, June 2, 2005.
Number of inspections: 18
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE05-01936 Electrical Rough-In6/2/20056/2/20056/3/2005 10:11:53 AMPPASS
###-#### Patio Room called contr to put on pan box for outside light, ric ok
ELE05-01450 Final6/2/20056/2/20056/2/2005 4:23:27 PMPPASS
toby; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa corrections made, ok to final, signed inspection card
ELE05-01469 Final6/2/20056/2/20056/2/2005 4:22:18 PMPPASS
Internet Inspection Request from: Laurie Allen ok to final
ELE05-01898 Final6/2/20056/2/20056/2/2005 3:25:47 PMPCANC
Internet Inspection Request from: Laurie Allen sign not scheduled to be done for a couple of weeks
ELE05-01922 Electrical Rough-In6/2/20056/2/20056/2/2005 2:53:11 PMPCANC
###-#### done by rip
ELE05-00335 Final6/2/20056/2/20056/2/2005 2:14:52 PMPPASS
dennis; Phone #: ###-#### Note: please ring the doorbell a couple times-he will be asleep Internet Inspection Request from: Cathy Chiles corrections made, ok to final
ELE05-01830 Electrical Rough-In6/2/20056/2/20056/2/2005 2:04:58 PMPPASS
uffer ground mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie gnd elect cond ok to pour
ELE04-02639 Electrical Rough-In6/2/20056/2/20056/2/2005 12:54:03 PMPPASS
Wall rough-in. Thanks!; Phone #: ###-#### Internet Inspection Request from: Heather Packer sw and west wall ok to cover
ELE05-01922 Rough-In Permanent Service6/2/20056/2/20056/2/2005 12:33:50 PMPPASS
###-#### ric ok, p/s u/g n ok
ELE04-03983 Final6/1/20056/2/20056/2/2005 11:20:09 AMAFAIL
Scheduled by a contractor via Hello! on 6/1/2005 at 3:13:10 PM. Contact: ###-####. called contr, left corr notice, 400.8(5) flex shall not be above clg,400.8(1) flex cord shall not be used for perm wiring,408.4 ckt directory shall be sufficient d
ELE05-01900 Electrical Rough-In6/1/20056/2/20056/2/2005 11:03:50 AMACANC
Ready for Rough-in inspection late morning, Electrician will be there. Please coordinate last inspection of the morning (11-11:30am) Thank you.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH see cloned
ELE05-01556 Final5/31/20056/2/20056/2/2005 10:16:30 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Dana Moyer ok to final
ELE05-01382 Final6/2/20056/2/20056/2/2005 9:59:27 AMAPASS
5732302 Internet Inspection Request from: Bob Glenn ok to final
ELE05-00284 Electrical Rough-In6/1/20056/2/20056/2/2005 9:43:50 AMAPASS
ceiling cover & RTU. Please contact Steve, thank you.; Phone #: ###-#### Internet Inspection Request from: Wendy Waters ceiling insulation only, ok to cover. rooftop disconnects ok
ELE05-01215 Final6/2/20056/2/20056/2/2005 9:25:11 AMAPASS
Please perform final inspection on this permit for tenant improvement of Suite C. See Permit # ELE04-03889. If door is locked, there is a key at the job site. Call for the location of the key.; Phone #: ###-#### Internet Inspection Request from: Davi
ELE04-03889 Final6/2/20056/2/20056/2/2005 9:24:18 AMAPASS
Please final Shell and Core portion of this project. Suite A, B, and D have been previously inspected. This request is for Suite C which is the final location. The Shell and core consists of the mechanical room (closet where panel is located ) and restroo
ELE05-01888 Final6/1/20056/2/20056/2/2005 9:23:22 AMAPASS
lisa; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa p/s o/h n ok
ELE05-01900 Permanent Service6/2/20056/2/20056/2/2005 12:00:00 AMAPASS
Ready for Rough-in inspection late morning, Electrician will be there. Please coordinate last inspection of the morning (11-11:30am) Thank you.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH p/s u/g re-connect ok