ELE05-01936
| Electrical Rough-In | 6/2/2005 | 6/2/2005 | 6/3/2005 10:11:53 AM | P | PASS |
|
|
###-#### Patio Room called contr to put on pan box for outside light, ric ok
|
ELE05-01450
| Final | 6/2/2005 | 6/2/2005 | 6/2/2005 4:23:27 PM | P | PASS |
|
|
toby; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa corrections made, ok to final, signed inspection card
|
ELE05-01469
| Final | 6/2/2005 | 6/2/2005 | 6/2/2005 4:22:18 PM | P | PASS |
|
|
Internet Inspection Request from: Laurie Allen ok to final
|
ELE05-01898
| Final | 6/2/2005 | 6/2/2005 | 6/2/2005 3:25:47 PM | P | CANC |
|
|
Internet Inspection Request from: Laurie Allen sign not scheduled to be done for a couple of weeks
|
ELE05-01922
| Electrical Rough-In | 6/2/2005 | 6/2/2005 | 6/2/2005 2:53:11 PM | P | CANC |
|
|
###-#### done by rip
|
ELE05-00335
| Final | 6/2/2005 | 6/2/2005 | 6/2/2005 2:14:52 PM | P | PASS |
|
|
dennis; Phone #: ###-#### Note: please ring the doorbell a couple times-he will be asleep Internet Inspection Request from: Cathy Chiles corrections made, ok to final
|
ELE05-01830
| Electrical Rough-In | 6/2/2005 | 6/2/2005 | 6/2/2005 2:04:58 PM | P | PASS |
|
|
uffer ground mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie gnd elect cond ok to pour
|
ELE04-02639
| Electrical Rough-In | 6/2/2005 | 6/2/2005 | 6/2/2005 12:54:03 PM | P | PASS |
|
|
Wall rough-in. Thanks!; Phone #: ###-#### Internet Inspection Request from: Heather Packer sw and west wall ok to cover
|
ELE05-01922
| Rough-In Permanent Service | 6/2/2005 | 6/2/2005 | 6/2/2005 12:33:50 PM | P | PASS |
|
|
###-#### ric ok, p/s u/g n ok
|
ELE04-03983
| Final | 6/1/2005 | 6/2/2005 | 6/2/2005 11:20:09 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 6/1/2005 at 3:13:10 PM. Contact: ###-####. called contr, left corr notice, 400.8(5) flex shall not be above clg,400.8(1) flex cord shall not be used for perm wiring,408.4 ckt directory shall be sufficient d
|
ELE05-01900
| Electrical Rough-In | 6/1/2005 | 6/2/2005 | 6/2/2005 11:03:50 AM | A | CANC |
|
|
Ready for Rough-in inspection late morning, Electrician will be there. Please coordinate last inspection of the morning (11-11:30am) Thank you.; Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH see cloned
|
ELE05-01556
| Final | 5/31/2005 | 6/2/2005 | 6/2/2005 10:16:30 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Dana Moyer ok to final
|
ELE05-01382
| Final | 6/2/2005 | 6/2/2005 | 6/2/2005 9:59:27 AM | A | PASS |
|
|
5732302 Internet Inspection Request from: Bob Glenn ok to final
|
ELE05-00284
| Electrical Rough-In | 6/1/2005 | 6/2/2005 | 6/2/2005 9:43:50 AM | A | PASS |
|
|
ceiling cover & RTU. Please contact Steve, thank you.; Phone #: ###-#### Internet Inspection Request from: Wendy Waters ceiling insulation only, ok to cover. rooftop disconnects ok
|
ELE05-01215
| Final | 6/2/2005 | 6/2/2005 | 6/2/2005 9:25:11 AM | A | PASS |
|
|
Please perform final inspection on this permit for tenant improvement of Suite C. See Permit # ELE04-03889. If door is locked, there is a key at the job site. Call for the location of the key.; Phone #: ###-#### Internet Inspection Request from: Davi
|
ELE04-03889
| Final | 6/2/2005 | 6/2/2005 | 6/2/2005 9:24:18 AM | A | PASS |
|
|
Please final Shell and Core portion of this project. Suite A, B, and D have been previously inspected. This request is for Suite C which is the final location. The Shell and core consists of the mechanical room (closet where panel is located ) and restroo
|
ELE05-01888
| Final | 6/1/2005 | 6/2/2005 | 6/2/2005 9:23:22 AM | A | PASS |
|
|
lisa; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa p/s o/h n ok
|
ELE05-01900
| Permanent Service | 6/2/2005 | 6/2/2005 | 6/2/2005 12:00:00 AM | A | PASS |
|
|