BLD05-00860
| FIRE-Final Inspection | 6/1/2005 | 6/2/2005 | 6/2/2005 3:23:28 PM | P | PASS |
|
|
Fire life safety finaled.
|
BLD05-00094
| FIRE-Final Inspection | 6/1/2005 | 6/2/2005 | 6/2/2005 1:26:48 PM | A | FAIL |
|
|
Several outstanding issues need resolved. Re-inspection required when ready.
|
FIR05-00258
| INSP-Sprinkler Rough-in | 6/2/2005 | 6/2/2005 | 6/2/2005 12:39:28 PM | P | PART |
|
|
Begin 24 hour air test of dry system overhead piping at 12:30 pm.
|
FIR05-00290
| INSP-Final Inspection | 6/2/2005 | 6/2/2005 | 6/2/2005 12:22:59 PM | | PASS |
|
|
Fire alarm finaled.
|
BLD04-02154
| FIRE-Final Inspection | 6/1/2005 | 6/2/2005 | 6/2/2005 10:37:19 AM | A | FAIL |
|
|
Final pending installation of visual indicator at greenhouse main entry/exit door.
|
BLD05-00637
| FIRE-Final Inspection | 6/1/2005 | 6/2/2005 | 6/2/2005 10:07:43 AM | A | FAIL |
|
|
Provide cfm on HVAC units to verify if duct smoke detection is required, provide suite address, demonstrate operation of vault door hardware-that it may be opened from the inside under any condition.
|
BLD04-02973
| FIRE-Final Inspection | 6/1/2005 | 6/2/2005 | 6/2/2005 9:28:54 AM | A | PASS |
|
|
Fire life safety finaled.
|
BLD05-00112
| FIRE-Final Inspection | 6/1/2005 | 6/2/2005 | 6/2/2005 9:27:20 AM | A | FAIL |
|
|
Provide max occupant load sign in confrence room, see note #13, provide current inspection tag on fire ext. in US bank suite copy room, provide approved door hardware on two doors in Racine suite 208.
|
FIR05-00152
| INSP-Sprinkler Rough-in/Hydro | 6/1/2005 | 6/2/2005 | 6/2/2005 8:29:59 AM | A | PART |
|
|
The two lengths of 8'' C-900 installed from thrust block at stub in are OK to cover.
|
FIR05-00107
| INSP-Final Inspection | 6/2/2005 | 6/2/2005 | 6/2/2005 12:00:00 AM | A | PASS |
|
|
Fire sprinkler finaled.
|
FIR05-00151
| INSP-Final Inspection | 6/2/2005 | 6/2/2005 | 6/2/2005 12:00:00 AM | P | PASS |
|
|
Fire alarm finaled.
|