BLD05-00656
| FIRE-Final Inspection | 6/1/2005 | 6/2/2005 | 6/2/2005 4:04:40 PM | P | FAIL |
|
|
Provide exit signs, exit discharge lighting and emergency lights per approved drawing sheet E2.1L, provide suite numbers and TI sprinkler drawings
|
BLD04-00870
| FIRE-Final Inspection | 6/1/2005 | 6/2/2005 | 6/2/2005 4:03:33 PM | P | FAIL |
|
|
Life safety is ok to final when the shell fire sprinkler permit is finaled
|
FIR04-00390
| INSP-Final Inspection | 6/1/2005 | 6/2/2005 | 6/2/2005 2:43:19 PM | P | FAIL |
|
|
Need to meet review note #1, need head wrench and forward flush
|
BLD05-00291
| FIRE-Final Inspection | 6/1/2005 | 6/2/2005 | 6/2/2005 2:28:34 PM | P | PART |
|
|
A temporary occupancy was given until the north exterior door has approved hardware installed. Per contractor hardware to be installed monday.
|
FIR05-00237
| INSP-Final Inspection | 6/2/2005 | 6/2/2005 | 6/2/2005 2:11:19 PM | P | PASS |
|
|
fire alarm finaled
|
FIR05-00293
| INSP-Final Inspection | 6/2/2005 | 6/2/2005 | 6/2/2005 2:08:44 PM | P | FAIL |
|
|
Permit can't be finaled until sprinklers are uncovered and ceiling tile is in. Also the main riser needs its annual inspection.
|
FIR05-00212
| INSP-Final Inspection | 6/2/2005 | 6/2/2005 | 6/2/2005 12:10:13 PM | P | FAIL |
|
|
Provide one piece fittings, need hydro test and anti-freeze signs and annual inspection tag. Need to review all review notes as this turned into just a preliminary inspection.
|
BLD04-02947
| FIRE-Final Inspection | 6/2/2005 | 6/2/2005 | 6/2/2005 11:05:59 AM | P | PASS |
|
|
Life safety finaled
|
BLD05-00310
| FIRE-Final Inspection | 6/1/2005 | 6/2/2005 | 6/2/2005 10:08:27 AM | A | PASS |
|
|
Fire life safety finaled. New addition is empty. Can't verify storage.
|
BLD05-01287
| FIRE-Final Inspection | 6/1/2005 | 6/2/2005 | 6/2/2005 9:51:57 AM | A | CANC |
|
|
Duplicate inspection, see previous entry
|