Inspections for the day of: Friday, June 2, 2006.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE06-02021 Electrical Rough-In6/2/20066/2/20066/2/2006 4:22:15 PMPCANC
Randy; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt called contr, no address posted, no job id posted, no plans showing chiropracter- only office space for ti.Told contr to ensure paper work is complete and to call in correct type inspection.
ELE06-02022 Electrical Rough-In6/2/20066/2/20066/2/2006 3:49:23 PMPCANC
Randy; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt called contr, wrong type inspection, wanted rip, told he needed to look at some items such as cond support, make-up told contr to call for correct inspection
ELE06-01586 Electrical Rough-In6/2/20066/2/20066/2/2006 3:18:08 PMPPASS
Requesting a UFER inspection.; Phone #: ###-#### Internet Inspection Request from: Dan Hardisty ok to pour gec
ELE06-01346 Final6/1/20066/2/20066/2/2006 2:24:01 PMPPART
Phone #: ###-#### Internet Inspection Request from: JENNY EMEL addition ok to final, need to see remodel to complete.Signed t/o card.
ELE05-04053 Electrical Rough-In6/2/20066/2/20066/2/2006 1:41:22 PMPPASS
Scheduled by a contractor via Hello! on 6/2/2006 at 11:11:11 AM. Contact: ###-####. ok to pour equipotential plane, grid only on house side, 1 piece copper goes around north side. Check at final that grass only on west, south, and north sides pool
ELE06-01452 Conference6/1/20066/2/20066/2/2006 11:49:02 AMADONE
Phone #: ###-#### Internet Inspection Request from: Todd Holbrook talked about lighting showroom displays, told that structural would be biggest concern, elect ok
ELE06-01313 Electrical Rough-In6/1/20066/2/20066/2/2006 10:23:17 AMAPASS
Scheduled by a contractor via Hello! on 6/1/2006 at 8:35:23 AM. Contact: ###-####. corr made, ri walls and ceilings ok
ELE06-00755 ELE-Aging Inspection6/2/20066/2/20066/2/2006 9:59:11 AM DONE
see final
ELE06-00755 Final6/2/20066/2/20066/2/2006 9:58:50 AMAPASS
looked at sign ok to final
ELE06-01314 Final6/2/20066/2/20066/2/2006 9:56:33 AMAPASS
Scheduled by a contractor via Hello! on 6/2/2006 at 6:27:51 AM. Contact: ###-####. ok to final
ELE05-04669 Final6/2/20066/2/20066/2/2006 9:35:57 AMAPASS
looked at sign, ok to final
ELE06-01898 Electrical Rough-In6/1/20066/2/20066/2/2006 9:26:45 AMAPART
Scheduled by a contractor via Hello! on 6/1/2006 at 10:20:23 AM. Contact: ###-####. looked at se and middle so part of floor for u/g, forgot green sticker since they really need another inspection in and around area. ok to cover area looked at.
ELE06-02017 Final6/1/20066/2/20066/2/2006 9:06:13 AMAPASS
Andy - please call 1st so he can meet there ; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt called contr to remove gazebo and close phone pedestal so no metal. ok to final, u/g ok
ELE06-02013 Electrical Rough-In6/1/20066/2/20066/2/2006 8:35:26 AMAFAIL
dennis kelley; Phone #: ###-#### Internet Inspection Request from: Darla Downs met elect, told to call and change name on permit, nec 300.4(D) mc shall be 1 1/4" from edge of framing member, 330.30(B) mc shall be supported within 12" of box, 300.11(A) no low voltage shall be supported by ceiling grid or support wires,BCC approved set of plans shall be on job, left corr notice with elect in office #152