BLD08-01555
| FIRE-Conference | 6/2/2009 | 6/2/2009 | 6/3/2009 8:10:01 AM | P | DONE |
|
|
On site conference regarding fire alarm permit work site inspection schedule and related fire sprinkler system interconnections.
|
BLD08-01640
| FIRE-Final Inspection | 6/2/2009 | 6/2/2009 | 6/3/2009 8:09:38 AM | P | PART |
|
|
On site conference regarding fire alarm permit work site inspection schedule and related fire sprinkler system interconnections.
|
FIR09-00289
| INSP-Final Inspection | 6/2/2009 | 6/2/2009 | 6/3/2009 8:06:09 AM | P | PART |
|
|
See annotations on plans for alarm devices tested including one pull station at the main FACP and three notification appliances in the west side of the remodel, discussed relocation of existing devices at the east half of the phased work area.
|
BLD09-00337
| FIRE-Final Inspection | 6/2/2009 | 6/2/2009 | 6/3/2009 8:02:57 AM | P | FAIL |
|
|
Need to post building address numbers, provide signage above the main entry/exit door "door to remain.......", provide a tagged fire extinguisher and post as discussed.
|
BLD08-02428
| FIRE-Final Inspection | 6/2/2009 | 6/2/2009 | 6/2/2009 12:54:52 PM | P | PASS |
|
|
Building shell life safety inspection completed okay, hardware at the west exit doors to be made compliant prior to occupancy approvals.
|