MEC11-01592
| Final | 5/31/2011 | 6/2/2011 | 6/2/2011 3:43:59 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Shannon Wells
|
MEC10-04338
| Final | 6/2/2011 | 6/2/2011 | 6/2/2011 3:43:47 PM | P | NH |
|
|
>> Inspection requested via web by Stephanie Brown locked up
|
PLM11-00602
| Plumbing Rough-in | 6/2/2011 | 6/2/2011 | 6/2/2011 2:57:12 PM | P | PART |
|
|
waste ri ok
|
MEC11-01626
| Final | 6/2/2011 | 6/2/2011 | 6/2/2011 2:40:26 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Jennifer Roy
|
MEC11-01624
| Rough-in | 6/2/2011 | 6/2/2011 | 6/2/2011 2:39:51 PM | P | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Jennifer Roy
|
MEC11-01603
| Final | 6/1/2011 | 6/2/2011 | 6/2/2011 2:28:07 PM | P | PASS |
|
|
gas to gas in garage Phone #: ###-#### >> Inspection requested via web by John Bertram
|
MEC11-01068
| Final | 6/1/2011 | 6/2/2011 | 6/2/2011 1:27:05 PM | A | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by Debbie Marino duct blaster test required
|
MEC11-01404
| Pressure Test | 6/1/2011 | 6/2/2011 | 6/2/2011 1:08:59 PM | A | PASS |
|
|
Call Eric @ ###-#### with any installation issues Phone #: ###-#### >> Inspection requested via web by Angie maguire 20# test ok
|
MEC11-01404
| Rough-in | 6/1/2011 | 6/2/2011 | 6/2/2011 1:08:27 PM | A | FAIL |
|
|
Call Eric @ ###-#### with any installation issues Phone #: ###-#### >> Inspection requested via web by Angie maguire 2nd floor coil is smaller than design. windows dont match design. 2nd floor secondary drain connected to primary drain. duct blaster test ok 20# gas test ok
|