Inspections for the day of: Thursday, June 2, 2011.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorSteven Webb
Title 
Phone #794-9491
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00678 Aging Inspection6/2/20116/2/20116/9/2011 7:40:11 AM CANC
ESC09-00599 General Inspection6/2/20116/2/20116/2/2011 2:45:27 PM FAIL
Called contractor, no answer. Will discuss with inspector 460 and perform follow up inspection. Area graded to the water edge and indications that dirt has even been pushed into the water. No sediment barrier in place. Informed contractor via telephone that protection of the ditch is needed.
ESC10-00786 Random Inspection6/2/20116/2/20116/2/2011 1:58:30 PMAPASS
Willow Lane Complex: Dewatering from a vegetative area into a storm drain inlet. Talked to City Park Staff-Joe. Water is irrigation overflow. Ok as long as ACHD has no problems and the water is clear prior to entering the storm drain.
ESC11-00315 General Inspection6/2/20116/2/20116/2/2011 11:27:10 AMPFAIL
Verbal to RP: 1) Install sediment barriers both side of canel, 2) Prepare a washout basin, 3) Install at least a 50 foot rock construction entrance, 4) Post sign at construction entrance. Complete work today, re-inspection will take place on Friday, 6/3, Failure to comply will result in elevated enforcement measures, written correction notice and stop work order.
ESC11-00334 Site Preparation6/2/20116/2/20116/2/2011 11:15:30 AMAFAIL
Working without a permit, re-investigation fee added onto fees due. Work stopped until permits are issued. Project is dug and concrete forms in place, ready for placement of concrete.
ESC11-00297 Random Inspection6/2/20116/2/20116/2/2011 10:38:44 AMAPASS
Sign posted, sediment barrier down gradient of disturbed area.
ESC11-00196 General Inspection6/2/20116/2/20116/2/2011 10:08:58 AM DONE
ESC11-00196 DOC - Permit Finaled6/2/20116/2/20116/2/2011 10:08:40 AMPPASS
stablized