ELE13-02956
| Final | 6/1/2014 | 6/2/2014 | 6/2/2014 1:50:49 PM | A | NR |
|
|
Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin Not ready for final inspection,additional heat matt has been added
|
ELE14-00329
| Final | 6/2/2014 | 6/2/2014 | 6/2/2014 1:48:01 PM | P | PASS |
|
|
install 1 wall sign reading Jacksons. All primary power by others Phone #: ###-#### >> Inspection requested via web by Ken Olsen Listed sign, final ok
|
ELE14-01392
| Temporary Service | 6/2/2014 | 6/2/2014 | 6/2/2014 12:23:42 PM | P | PASS |
|
|
when you drive into the subdivision it will be on your right where the subdivision drainage is. The power pole will be right in the back and there are 2 foundations that are poured. let me know if you have questions. Thanks Daryl Phone #: ###-#### >> Inspection requested via web by daniel bibikov t/s u/g n ok Appreciate the directions
|
ELE14-01379
| Permanent Service | 5/30/2014 | 6/2/2014 | 6/2/2014 10:45:39 AM | A | PASS |
|
|
Jay-perm. ser. for M.H. Phone #: ###-#### p/s o/h rec ok Call for final after power has been connected
|
ELE14-00392
| Final | 6/1/2014 | 6/2/2014 | 6/2/2014 9:36:25 AM | A | PART |
|
|
Doors have been done Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin Partial final Panic hardware installed on service equipments room doors completed
|
ELE14-01268
| Electrical Rough-In | 5/30/2014 | 6/2/2014 | 6/2/2014 9:00:29 AM | A | PASS |
|
|
underground for entrance #4 near Dillards, as early as possible, concrete is scheduled for 10am Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin rough-in ok cover CSA Listed heat matt Dillards east entrance
|