Inspections for the day of: Monday, June 2, 2014.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDaryl DeGrange
TitleELE-INSPECTION SUPV
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE13-02956 Final6/1/20146/2/20146/2/2014 1:50:49 PMANR
Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin Not ready for final inspection,additional heat matt has been added
ELE14-00329 Final6/2/20146/2/20146/2/2014 1:48:01 PMPPASS
install 1 wall sign reading Jacksons. All primary power by others Phone #: ###-#### >> Inspection requested via web by Ken Olsen Listed sign, final ok
ELE14-01392 Temporary Service6/2/20146/2/20146/2/2014 12:23:42 PMPPASS
when you drive into the subdivision it will be on your right where the subdivision drainage is. The power pole will be right in the back and there are 2 foundations that are poured. let me know if you have questions. Thanks Daryl Phone #: ###-#### >> Inspection requested via web by daniel bibikov t/s u/g n ok Appreciate the directions
ELE14-01379 Permanent Service5/30/20146/2/20146/2/2014 10:45:39 AMAPASS
Jay-perm. ser. for M.H. Phone #: ###-#### p/s o/h rec ok Call for final after power has been connected
ELE14-00392 Final6/1/20146/2/20146/2/2014 9:36:25 AMAPART
Doors have been done Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin Partial final Panic hardware installed on service equipments room doors completed
ELE14-01268 Electrical Rough-In5/30/20146/2/20146/2/2014 9:00:29 AMAPASS
underground for entrance #4 near Dillards, as early as possible, concrete is scheduled for 10am Phone #: ###-#### >> Inspection requested via web by Bryan McLaughlin rough-in ok cover CSA Listed heat matt Dillards east entrance