Inspections for the day of: Monday, June 2, 2014.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00028 DOC - Permit Finaled6/2/20146/2/20146/2/2014 3:39:23 PMPPASS
Demolition of house complete. No active construction. ESC permit conditions satisfied.
ESC14-00028 Complaint Inspection6/2/20146/2/20146/2/2014 3:38:26 PMPPASS
Complaint received for this address via email. House was demolished in January.

No sediment or illicit discharges observed. Site did not appear unsafe and hole has been back-filled and has re-vegetated.

Not seeing any violations at time of inspection. No new permits pulled for parcel currently.
ESC13-00749 General Inspection6/2/20146/2/20146/2/2014 11:57:23 AM PASS
House construction complete. Final landscaping and stabilization in progress at time of inspection. No violations observed.
ESC14-00289 Random Inspection6/2/20146/2/20146/2/2014 11:47:08 AMPPASS
Driveway approach has been graded and foundation excavated with concrete forms in place but no concrete poured. Walked downslope of project and disturbed dirt is surrounded by vegetative buffer. Permit posted, DI protected. No corrections.
ESC09-00352 General Inspection6/2/20146/2/20146/2/2014 11:30:49 AM PASS
No new recent acitivity. The excavation observed in wetlands in January/February was prep to plant native wetland trees, which have now been planted.
ESC13-00199 Aging Inspection6/2/20146/2/20146/2/2014 10:58:31 AM PASS
Some parcels remain open for new construction. RP for Tahoe Homes maintained DI on alley for phase 11. This permit is for the actual subdivision development/grading/paving by Knife River, but is open to keep an eye on this area of heavy construction and potential for ESC issues.
ESC13-00230 General Inspection6/2/20146/2/20146/2/2014 10:42:21 AM PASS
River Heights 5 has about 50% of all parcels complete or in progress. Central area is being used for landscape stockpile operations, the construction entrance installed is in good condition. DI bags and concrete washout pit have remaining capacity.

Some dirt in gutters but many contractor vehicles line the street. Will need to be address in next schedule street cleaning.
ESC13-01005 General Inspection6/2/20146/2/20146/2/2014 10:36:30 AM PASS
Foundation is complete, vertical constrution has not yet started. Permit posted. Tripplett townhouse subdivision in good condition. Witnessed cement truck using the designated and lined washout pit.
ESC14-00238 Random Inspection6/2/20146/2/20146/2/2014 10:36:30 AMPPASS
WIP. Crew continuing work on repaving east bound land of Warm Springs. Trench is installed. Brooms onsite, no stormwater structures or surface water adjacent to construction area.

No corrections.
ESC14-00144 Random Inspection6/2/20146/2/20146/2/2014 10:24:27 AMPPASS
East Valley sub inspected en route to other inspections:

No significant fugitive dust or track out. No discharges or material storage issues. Stockpile from hillside excavation is in active use, but the undisturbed end has vegetated.

No corrections at this time. Looks like road will be installed soon...
ESC13-00768 General Inspection6/2/20146/2/20146/2/2014 10:07:35 AM PASS
House is near completion with final landscaping installed. BLD permit is still open and some construction materials remain on site. Will continue to monitor final clean up/construction shut down of Elevation Ridge.
ESC13-00939 General Inspection6/2/20146/2/20146/2/2014 9:25:59 AM PASS
Finaled.
ESC13-00939 DOC - Permit Finaled6/2/20146/2/20146/2/2014 9:25:46 AMPPASS
Vista Bar addition is complete and occupied for business. All disturbed/utility trenched areas have been stabilized. ESC permit conditions satisfied.
ESC13-00024 Aging Inspection6/2/20146/2/20146/2/2014 9:12:17 AM PASS
ESC13-00443 Aging Inspection6/2/20146/2/20146/2/2014 8:43:51 AM PASS
ESC14-00459 Site Preparation5/30/20146/2/20146/2/2014 8:11:41 AMACANC
nate ###-####

Inspection conducted Friday 5/31 and was approved. See activity notes.