BLD15-00402
| BLD-Ceiling Grid Inspection | 6/2/2015 | 6/2/2015 | 6/3/2015 1:12:25 PM | P | PASS |
|
|
Please call Nic a half hour before inspection - Thanks. Phone #: ###-#### Inspection requested via web by Nic van Diepen
|
BLD15-01690
| BLD-Footing | 6/2/2015 | 6/2/2015 | 6/3/2015 7:52:13 AM | P | PASS |
|
|
Gate on the side // Kelly Phone #: ###-####
|
BLD15-01779
| BLD-Final | 6/2/2015 | 6/2/2015 | 6/3/2015 7:50:52 AM | P | PASS |
|
|
Roofing complete. Phone #: ###-#### Inspection requested via web by Richard Murray
|
BLD15-01101
| BLD-Framing/Rough-in | 6/1/2015 | 6/2/2015 | 6/3/2015 7:50:01 AM | P | PASS |
|
|
Bill Phone #: ###-####
|
BLD15-00701
| BLD-Footing | 6/2/2015 | 6/2/2015 | 6/3/2015 7:49:36 AM | P | PASS |
|
|
Manual Phone #: ###-####
|
BLD15-00703
| BLD-Foundation | 6/2/2015 | 6/2/2015 | 6/3/2015 7:49:12 AM | P | PASS |
|
|
Manual Phone #: ###-####
|
GCB15-00012
| GCB-Energy | 6/1/2015 | 6/2/2015 | 6/3/2015 7:48:32 AM | A | NR |
|
|
Travis ###-####
|
GCB14-00099
| GCB-Courtesy | 6/2/2015 | 6/2/2015 | 6/3/2015 7:47:36 AM | P | DONE |
|
|
Gary ###-#### - conference for cover 3rd floor Pending sprinkler tenting insp. 3rd flr South of 2 hr wall.
|
GCB15-00051
| GCB-Final | 6/1/2015 | 6/2/2015 | 6/2/2015 11:17:37 AM | A | PASS |
|
|
Kelley ###-####
|
BLD15-00416
| BLD-Energy code compliance | 6/1/2015 | 6/2/2015 | 6/2/2015 10:38:57 AM | A | PASS |
|
|
Paul Phone #: ###-####
|
BLD15-01167
| BLD-Final | 6/1/2015 | 6/2/2015 | 6/2/2015 10:30:17 AM | A | PART |
|
|
block & tie; Daniel Phone #: ###-#### Block and Tie .....OK
|
BLD15-01182
| BLD-Wall Bracing | 6/1/2015 | 6/2/2015 | 6/2/2015 10:05:43 AM | A | PASS |
|
|
Bill Phone #: ###-####
|